Cleanroom Certification: US Facility Managers’ Scope Comparison

Advertisement

Compare Clean Rooms International’s published testing and balancing services with VaLogic Bio’s broader measurement and reporting framework, then get a written commitment to the conditions and deliverables your facility needs. [1][4] Certification documents performance under tested conditions; particle classification alone does not establish sterility, process validation or broader compliance. [3][5]

State-of-the-art laboratory machinery and equipment in an industrial research environment.
Advertisement

Compare the providers’ published scopes

Clean Rooms International

  • Operating-state coverage: CRI recommends operational testing if only one state is selected.[1] Specify each quoted state using the ISO definition and agreed equipment conditions below, rather than relying on a supplier’s shorthand.[6]
  • Measurements: Its services include non-viable particle counts, HEPA scanning, room pressure, temperature/humidity, HVAC performance testing and balancing. Air-pattern testing is optional and depends on ISO class. [1]
  • Report coverage: Request written confirmation of a mapped, room-level reporting package, including location maps, individual results and supporting records. [1]

VaLogic Bio

  • Operating-state coverage: VaLogic’s typical scope calls for particle testing in the required occupancy state.[4] Require the quotation to record the agreed equipment operation and personnel conditions for that state.[6]
  • Measurements: Its typical scope includes particles, airflow volume/velocity and air changes, boundary pressure differentials, HEPA scanning, airflow visualization, temperature/humidity and recovery testing. [4]
  • Report coverage: Its guidance describes calibration information, test locations mapped to room drawings, raw measurements, pass/fail decisions against acceptance criteria, deviations and corrective actions. Put these deliverables in the quotation rather than assuming the guidance guarantees inclusion. [4]

CRI’s published HVAC testing and balancing detail provides a starting point for projects involving those services. [1] VaLogic’s report framework and pharmaceutical, biotech and medical-device support provide a starting point for those projects. [4] These distinctions describe the pages—not evidence either provider lacks the other’s capabilities. [1][4] Ask each to confirm service at the facility address; US office locations do not establish nationwide availability. [1][4]

Advertisement

Specify room conditions before requesting quotes

Use ISO 14644-1:2015, clauses 3.3.1–3.3.3 for occupancy-state terminology. At-rest means the completed room has installed equipment operating in an agreed manner and no personnel present. It does not impose a blanket requirement to stop all equipment.[6]

As-built has services connected and functioning but no equipment, furniture, materials or personnel. Operational means the room functions as specified, with equipment operating and the specified personnel present. Record the actual equipment settings and personnel conditions alongside the state label.[6]

Adapt this scope wording:

“Test room/zone [identifier] in [selected state]. Installed equipment: [items, running or stopped]. HVAC operating mode: [mode]. Personnel: [count and activities]. Materials present: [list]. Representative interventions: [describe]. Stabilize the room before testing under [agreed arrangements and readiness criteria].” [2][3][5]

Check whether the selected condition represents the intended use and whether another state needs separate testing. For applicable USP <797> sterile-compounding work, the Washington Pharmacy Quality Assurance Commission’s 2025 worksheet reproduces Section 5 requirements for particle counts and PEC smoke-pattern tests under dynamic conditions. An at-rest particle result cannot stand in for those required dynamic tests. Confirm the requirements adopted by the facility’s own jurisdiction.[7]

Advertisement

Separate certification, retesting and microbial monitoring

Request three itemized scopes, even if one contractor quotes them together. Testing produces measurements; certification adds a pass/fail decision against written criteria; monitoring tracks conditions between certifications. [3]

  • Baseline physical certification. Request a room and primary engineering control (PEC) inventory, operating states, tests, methods, acceptance criteria, report deliverables and exclusions. For applicable USP <797> work, Applied Physics’ guidance recommends checking coverage of each applicable classified area and PEC, including isolators. [3][4][5]
  • Corrective-action retesting. Ask what constitutes a return visit, who determines partial versus full retesting, and whether the price includes investigation, adjustments and repeat testing. Require documented repeat results. VaLogic describes partial or full retesting after corrective action and before release. [3][4]
  • Viable air and surface monitoring. Request a separate scope and sampling plan where applicable. Applied Physics distinguishes USP <797> Section 6 microbiological monitoring from Section 5 physical certification; particle counts do not substitute for viable monitoring. [3]

The cited CRI and VaLogic pages do not state prices or commercial terms. Ask for project-specific pricing for each scope, travel charges, scheduling assumptions, report turnaround and cancellation terms in writing. [1][4]

Advertisement

Link particle classification to a room-level sampling plan

Identify the ISO 14644-1 edition, target class, particle sizes, physical boundaries, room or zone area, and occupancy state in the written scope. A class label alone leaves out the conditions and boundaries the result represents. [5]

Before the visit, request:

  • A room drawing with sampling-location identifiers carried through to the reported measurements. [5]
  • Sample volumes and durations, plus personnel counts and equipment conditions relevant to the method. [3]
  • The sampling method and rationale for the number and placement of locations and selected volumes. [3][5]

Ask the provider to identify the sampling-location and sample-volume requirements for the selected edition and document their application to each room. [3][5]

Require room and location identifiers beside individual particle results and acceptance decisions—not a room-wide average that could conceal a failing location. [5] Keep the conclusion specific: particle classification does not establish microbiological cleanliness, sterility or aseptic-process validation. [5]

Advertisement

Define supporting measurements and acceptance criteria

Select supporting tests for the room’s intended use rather than treating every available method as mandatory. [5]

  • HEPA integrity: Identify filters and seals covered, aerosol and challenge conditions, scan method and acceptance limit. CRI’s service page specifies that no measurement may exceed 0.01% of upstream concentration; treat this as its published criterion, not a universal limit for every application. [1][3]
  • Airflow: Specify velocity or volume measurements, air changes per hour where relevant, and whether adjustment or balancing is included. CRI lists supply/exhaust diffuser balancing and air-handler performance testing; distinguish these services from measurement alone. [1][5]
  • Pressure: List room and airlock boundaries and the required pressure direction at each, including containment relationships where applicable. Cantrol’s background guidance describes testing pressure cascades across these boundaries. [2][3]

Add visualization, recovery and temperature/humidity measurements where intended use calls for them.[4][5] For applicable USP <797> work, the Washington worksheet identifies dynamic smoke-pattern testing for each PEC; include that item explicitly in the certification quote.[7]

Advertisement

Match the delivered report to the quotation

A passing certificate should have supporting results traceable to each scoped room and sampling location. [5] Use this quote-to-report checklist to define the package before testing and review it afterward.

  • Room identity and conditions. In the quotation, require a drawing-linked inventory of rooms, zones and applicable PECs, with boundaries, target classes and intended conditions. In the report, match that inventory to the tested state, including equipment and personnel conditions. Resolve missing areas or PECs before acceptance. [3][5]
  • Methods and instruments. Specify methods, acceptance criteria, instrument identification and calibration deliverables. Check the report against that scope, then match instrument models and serial numbers to calibration dates and supporting records. [3]
  • Location-level results. Specify mapped locations, sample volumes and raw measurements. Check that reported results link to those locations and show pass/fail decisions against explicit criteria, without averaging away a failing location. [5]
  • Exceptions and authorization. Require omissions, limitations, deviations, failures, corrective actions and repeat tests to be documented. Check links between corrective actions and repeat-test evidence, along with responsible personnel, signatures, dates and the next due date where applicable. [3]

If accreditation is offered as reassurance, check its scope: unrelated ISO/IEC 17025 accreditation does not establish competence in the cleanroom testing being purchased. [5] Return an incomplete package for clarification rather than approving it solely because the certificate says “pass.”

Advertisement

Plan follow-up after changes or failures

A report documents tested conditions, not subsequent changes. Assess follow-up testing when changes could affect airflow, filtration, pressure or operating conditions. [3][5]

  • Facility and filtration: Review HEPA repair or replacement, HVAC work, construction, and wall or ceiling penetrations for recertification. Cantrol’s background guidance also identifies extended downtime as a trigger. [2][3]
  • Equipment and operations: Review equipment or layout changes, PEC relocation, altered airflow settings and material changes to operating procedures for their effect on the test scope. [3][5]

After failed testing, request an investigation, corrective action and a justified partial or full repeat-test scope. Link failures, actions and repeat results so the release decision rests on documented evidence of effectiveness—not a replacement certificate alone. [3][4]

Advertisement

Set the schedule by application. The Washington worksheet reproduces USP <797> Section 5: initial certification and recertification at least every six months for classified areas including PECs, plus recertification following relevant changes. Check the applicable jurisdiction and compounding requirements.[7] For other facilities, VaLogic describes risk-based recertification under ISO 14644-2. Document the governing requirement and rationale rather than applying the pharmacy interval to every cleanroom.[4]

Choose the provider committing in writing to the intended conditions, measurements and traceable evidence. Keep microbial monitoring and the broader quality program separate from particle classification and physical certification. [3][5]

Advertisement

References

  1. Services – CRI (cleanroomsint.com)
  2. Cleanroom Certification: What ISO 14644-1 Testing Involves (cantrolenvironmental.com)
  3. USP 797 Cleanroom Certification: Validation Steps (appliedphysicsusa.com, 2026)
  4. Cleanroom Certification: Standards, Process, Compliance, & More | VaLogic Bio (valogicbio.com, 2023)
  5. Class-100 Cleanroom Build: ISO Certifications Explained (promachineryfeed.com, 2026)
  6. ISO 14644-1:2015 — occupancy definitions (ISO text in distributor preview) (iteh.ai)
  7. Washington PQAC — 2025 USP 797 Sterile Compounding Addendum (govdelivery.com)