How to choose soil resistivity testing: Australian project owners

Advertisement

Start with a quote-ready survey scope

Choose soil resistivity testing against a designer-approved scope covering survey geometry, site conditions, raw measurements and interpretation—not field measurements alone. GridServe’s Victorian guidance describes a handoff containing raw field sheets, an apparent-resistivity plot and an interpreted layered soil model. [6]

Advertisement
A detailed view of an electronics workshop with various tools and components on a workbench.

Separate project requirements from the deliverables you commission:

  • Project requirements: ask the earthing designer or relevant network owner to confirm the applicable specification, traverse plan, electrode spacings, seasonal basis and any witnessing arrangements. ElectraNet’s specification and GridServe’s Victorian guidance illustrate why these need project-specific confirmation. [3][6]
  • Commissioned deliverables: explicitly include raw data, condition records, interpretation and the model outputs the designer needs. GridServe describes these as distinct field and design deliverables. [6]
  • Commercial controls: agree file formats, delivery dates, designer review, exclusions and approval of variations before booking.
Advertisement

Use this scope template, with technical values approved by the designer:

Provide soil resistivity testing and interpretation for [project name, site address and boundary], for use by [earthing designer].

  • Requirements and geometry: follow [applicable network requirements and revision], [approved traverse locations and orientations] and [electrode-spacing schedule]. Record the method, geometry and assumptions. Include GPS coordinates, electrode spacings and raw resistance readings in the field sheets. [6]
  • Access and conditions: allow for [access restrictions and known services] and test under [agreed seasonal/moisture conditions]. Record rainfall context, moisture, temperature, electrode depth, contact-resistance concerns and infrastructure interference, noting limitations. [1][5][6]
  • Data and interpretation: supply georeferenced field sheets, every spacing and raw resistance reading, an apparent-resistivity-versus-spacing plot, interpreted layer boundaries and [agreed model configuration] with layer resistivities and thicknesses. Identify [party responsible for interpretation] and document assumptions and limitations. [6]

Supply [file formats] by [submission date]. Allow [designer-review period and response process], list [exclusions], and obtain written approval from [authorised person] before changing the scope.

Advertisement

Confirm the governing project requirements

Have the designer identify the applicable document and revision, project-specific departures, survey coverage, seasonal basis, witnessing and acceptable handoff formats before accepting a quote.

GridServe says Victorian DNSPs—including AusNet Services, Jemena, CitiPower, Powercor and United Energy—require soil resistivity data for generation and large-load connection applications, and lists a minimum of 3–5 test locations across the site. [6] These are prompts for confirmation, not a universal Australian specification or evidence that every Victorian DNSP applies identical thresholds. [6]

ElectraNet’s June 2018 functional requirement specifies a soil model in accordance with IEEE Std 81:2012 and reserves the option to witness testing. Check whether that document, or a later applicable revision, governs the project rather than treating it as a national rule. [3]

Evoenergy’s manual identifies input validation and the basis of assumptions within its design scope. It provides a documentation precedent, not a national survey specification. [4] Ask the designer to define acceptance criteria for survey quality and interpretation before work starts.

Advertisement

Check the quote is for soil resistivity

Look for soil resistivity in Ω·m, not simply an electrode- or grid-resistance result. Apparent resistivity is calculated from measured resistance and electrode geometry. [6] Safearth explains that soil resistivity and layering affect earth-grid resistance and the assessment of touch- and step-voltage hazards. [1]

In Wenner testing, four temporary electrodes sit in a straight line at equal spacing. The instrument passes current between the outer electrodes, measures voltage between the inner electrodes and derives resistivity using the electrode spacing. [1]

An electrode-resistance test measures a different property. A clamp-on test measures the available loop’s impedance, not solely the electrode or grid. [1] If either is the only quoted method, ask the contractor to correct the scope to soil-resistivity testing for design.

Advertisement

Agree traverse locations and electrode spacings

Attach a marked-up site plan for the designer’s approval. Show proposed traverse locations and directions, available straight-line access, boundaries and known obstructions. The plan needs to accommodate Wenner’s straight-line, equally spaced electrode arrangement. [1]

Ask the contractor to confirm the full physical access footprint: electrode spacing is not the total length occupied by the arrangement. [1] Agree how restricted access, obstructions or inconsistent results will be referred to the designer before the contractor changes the plan.

GridServe, which offers surveys in Victoria, describes testing from 1 m spacing to 50 m or more, with each result reflecting average resistivity to a depth approximately equal to the spacing. This is an approximate explanation, not a precise depth boundary or a spacing schedule to copy into every brief. [6]

Leave traverse count, orientation, spacing sequence and maximum spacing to project-specific approval. Require actual traverse positions and field sheets recording GPS coordinates, every electrode spacing and every raw resistance reading, so the designer can relate results to their locations and geometry. [6]

Advertisement

Disclose ground conditions and interference

Before the visit, give the contractor an access-and-interference checklist. Agree who will arrange ground access and locate services:

  • Access: identify available survey areas, restricted areas and site-entry constraints.
  • Buried services: provide available service-location records and flag gaps requiring investigation. Evoenergy’s process includes collecting service records and nearby-infrastructure information. [4]
  • Conductive infrastructure: identify existing earthing, metallic fences, pipelines and other infrastructure that may affect measurements or design. [1][4]

Evoenergy’s manual includes stakeholder consultation and a joint site inspection—a project-specific example rather than a prescribed access procedure for every Australian site. [4]

Advertisement

Request rainfall context, moisture condition, temperature and season in the field record. GridServe warns that testing immediately after rain, or before moisture equilibrium, can understate resistivity. [6] Tempsand, which serves Australia-wide, also identifies soil type, salinity and seasonal variation as interpretation factors. [5]

Ask the contractor to record electrode depth, contact-resistance concerns, induction and infrastructure interference, and explain how suspect readings will be assessed during the visit. Safearth identifies these influences and recommends assessing results in the field. [1]

Agree seasonal testing with the designer. GridServe recommends wet- and dry-condition testing where seasonal variation is expected; this is guidance to discuss, not a nationwide obligation. [6]

Advertisement

Check supplier scope, price structure and terms

Ask suppliers to separate field testing, interpretation and reporting in the quote. Powerplant lists 11kV to 500kV earthing design capability; GridServe lists typical deliverables including test field sheets, resistivity plots and soil models. Confirm project-specific inclusions separately. [2][6]

Check the handoff. Powerplant advertises Australia-wide four-probe Wenner testing and CDEGS earthing design. [2] Ask it to specify the raw-data and interpreted-model handoff in writing rather than assuming design capability means those outputs are included.

Check the reporting scope. In Victoria, GridServe advertises Wenner surveys and earthing-design reporting, including georeferenced field sheets, apparent-resistivity plots and layered-model outputs. [6] Have the quote identify included outputs and whether subsequent design is a separate commission.

Advertisement

Check the programme. GridServe describes a “one-day field survey” in an early-testing context, not a guaranteed duration for every project. [6] Request separate dates for mobilisation, fieldwork and delivery of the interpreted report.

The cited Powerplant and GridServe pages do not state monetary prices or detailed cancellation and refund terms; Powerplant’s page also leaves the raw-data/model handoff format unspecified. [2][6] Request a written quote covering:

  • Included work: fieldwork, interpretation, reporting and revisions following designer feedback.
  • Additional charges: travel, mobilisation, extra visits and access delays, with a variation-approval process.
  • Timing and payment: lead time, quotation validity, deposits and payment milestones.
  • Booking changes: cancellation, refunds, rescheduling and weather postponements.

Also request relevant experience for the proposed field and interpretation personnel, plus evidence of professional-indemnity and public-liability insurance.

Advertisement

Have the designer review the data and model

Name the designer who will review the handoff and agree a review period before commercial close-out. Check the delivered package against the purchase order:

  • Coverage and raw records: actual traverse positions, coordinates, electrode geometry, every spacing and corresponding raw resistance reading, with departures from the approved plan identified. [1][6]
  • Calculated results: an apparent-resistivity-versus-spacing plot showing interpreted layer boundaries, with underlying readings retained. [6]
  • Model parameters: each layer’s resistivity and thickness. GridServe describes a two- or three-layer model; have the designer confirm the appropriate structure and representation of the deepest layer. [6]

Ask the interpreter to explain assumptions, scope departures and the treatment of inconsistent measurements. Have the designer specify usable file formats, any model-fit evidence required and a project-specific fit-error threshold. [1][6]

Agree who answers technical queries and how additional interpretation or fieldwork will be authorised and priced.

Keep survey acceptance separate from full earthing design. ElectraNet’s specification also identifies fault level and contributions, clearing time and system X/R as design inputs. [3] GridServe’s broader DNSP submission package typically includes CDEGS simulation results, earth grid drawings and a compliance statement against ENA EG-0 touch and step voltage limits, so explicitly include or exclude that work rather than assuming it comes with the survey. [6]

Send the scope to the designer for approval, then issue the same agreed scope with each quotation request.

References

  1. Understanding Correct Earthing Test Methods for your Application | Safearth Australia (safearth.com)
  2. Earthing Systems – Powerplant (powerplant.com.au)
  3. Substation Earthing Document Number: 1-11-FR-01 VERSION 1.0 June 2018 (electranet.com.au, 2018)
  4. 2023 • PO07127 • V6.2 1 OFFICIAL DISTRIBUTION EARTHING DESIGN MANUAL (evoenergy.com.au)
  5. Why Soil Resistivity Testing Is Critical for Safe Earthing in Australia? – Soil Thermal Resistivity & Conductivity Testing (soilthermalconductivity.com.au)
  6. Soil Resistivity Testing in Victoria for Earthing Design and DNSP Connections (gridserve.com.au, 2026)
Advertisement

Similar reads