UK Utility Mapping Survey: Compare Scopes for Designers

Advertisement

Spacion and Subvision describe records work, field detection and physical verification; Groundwise supplies desktop records searches rather than on-site surveys.[1][2][3] Compare their investigation scope, achieved-quality labels and CAD/report handover—not simply whether the quotation says “PAS 128”.

Surveyor with equipment at an active construction site, observing bulldozer operations.
Advertisement

Compare scope, achieved quality and handover

Spacion

  • Scope: Spacion lists desktop-record review, site reconnaissance, detection using ground-penetrating radar (GPR) and electromagnetic locating, and physical verification where intrusive confirmation is required. It agrees scope and outputs around the project brief, existing information and intended use.[1]
  • Achieved quality: Spacion says achieved PAS 128 quality levels are recorded against findings, rather than relying solely on an overall compliance statement.[1]
  • CAD/report handover: Its deliverables include coordinated DWG and PDF information, a 3D AutoCAD utility drawing—typically at 1:200 unless project requirements differ—and a PAS 128 report covering methodology, findings and achieved classification.[1]
Advertisement

Subvision

  • Scope: Subvision describes Type D records searches, Type C walkover correlation, Type B geophysical detection and Type A exposed verification. Detection normally combines electromagnetic locating and GPR; verification exposes services, usually through trial holes or vacuum excavation.[2]
  • Achieved quality: Subvision says every service on the drawing receives a quality label. It includes measured depths and notes where a service was traced but a depth could not be obtained.[2]
  • CAD/report handover: It specifies colour-coded, quality-labelled DWG and PDF drawings, supported by a report recording survey type, methods, coverage and limitations. Areas that could not be surveyed are identified.[2]
Advertisement

Groundwise

  • Scope: Groundwise supplies Type D/QL-D desktop utility searches covering known utility assets and network operators; it does not undertake on-site detection or physical verification.[3]
  • Achieved quality: The information remains records-based QL-D. Its optional CAD compilation organises those records into a drawing; it does not upgrade them to field-detected or physically verified quality.[3]
  • CAD/report handover: The desktop report combines utility-company documents and plans into one PDF. A separate Desktop Mapping CAD service compiles the report data into a layered DWG drawing.[3]

Define the project use before requesting quotations

Give each supplier the same brief. Spacion agrees scope around intended use and existing information, while Subvision asks for planned works, survey extent and access details.[1][2] Include:

Advertisement
  • Intended design use and planned works.[1][2]
  • A red-line plan, existing records and survey information.[1][2]
  • Critical zones, access restrictions and any requested survey type or quality level.[2]

For the scope description, Spacion and Subvision describe D as records review, C as correlation with visible site evidence, B as geophysical detection and A as physical verification.[1][2] Spacion describes records, electromagnetic location and GPR to the required PAS 128 survey type and quality level; ask suppliers to specify exclusions and conditional follow-up so quotations can be compared by work included rather than survey title. [1]

Flag public-highway areas at enquiry stage: Subvision says traffic management or permits may be needed.[2]

Advertisement

Specify achieved quality against findings and route segments

Ask the quotation to name the PAS 128 edition being used. Subvision describes PAS 128:2022 as replacing the 2014 version; confirm the edition in each proposal rather than assuming suppliers have specified the same one.[2]

Keep requested quality separate from achieved quality. Spacion says it records achieved levels against findings, while Subvision says every service on its drawings receives a quality label.[1][2] Use those commitments as a starting point, then request this acceptance condition:

Identify achieved quality against each finding or route segment, and mark where the supporting evidence or quality changes. Distinguish measured depths, unmeasured depths and record-derived information.

Advertisement

This segment-level requirement is a requested scope, not a promise established for every provider. Agree it before commissioning, rather than expecting a blanket compliance statement to answer local design questions.

Subvision describes QL-B1 to QL-B4 according to detection confidence and whether depth was measured, and says it notes services traced without an obtainable depth.[2] Do not read “detected” as “depth measured”: ask for the distinction explicitly. For any numerical tolerance needed in the brief, request the applicable specification reference rather than inferring it from a quality label.

Make unresolved and inaccessible areas visible

Subvision explicitly describes how it documents field-survey gaps: it notes services traced without measured depths, records wet-clay limitations on GPR on the drawing, includes coverage and limitations in its report, and identifies areas that could not be surveyed.[2]

Advertisement

Spacion’s cited page confirms achieved-quality recording and reporting, but does not explicitly confirm equivalent notes for missing depths or inaccessible areas.[1] Ask for those details in the quotation; the difference in published descriptions is not evidence of superior survey performance.

Groundwise warns that utility-company plans may be incomplete, lag installations or repairs, and show routes differing from their actual position.[3] These are limitations of the underlying records, not an account of where fieldwork succeeded or failed.

Before commissioning, ask for an anonymised drawing and supporting report showing how unresolved locations are marked. Look for a clear distinction between an unmeasured depth, an inaccessible area and a detection limitation. Treat this as a comparison request, not an assumed entitlement to sample documents.

Advertisement

Escalate records to detection or physical verification

Request further investigation when an unresolved route or depth prevents a design decision. Groundwise advises that its Utility Report is valid only at the time of production, although most companies state their utility data is valid for 90 days; it also warns that the supplied utility data carries no guarantee or warranty.[3]

For example, suppose a records-only route crosses a proposed foundation footprint without a confirmed depth. Request a targeted investigation of that interface rather than treating the desktop line as a resolved position.

  • Type B detection: Subvision describes geophysical detection, normally combining electromagnetic location and GPR.[2]
  • Type A verification: Subvision describes exposing services, usually through trial holes or vacuum excavation, to confirm position, depth, type and size. It identifies crossings, new connections and proximity to piles or foundations as typical uses.[2]

Ask the surveyor which combination can resolve the named uncertainty before fixing the affected design—not for trial holes everywhere or an assumed detection result. Subvision notes that ground conditions can limit GPR performance.[2]

Do not treat survey handover as permission to excavate or assume undetected services are absent. Keep safe-dig arrangements separate: Groundwise calls for suitable detection and safe-digging practice, while Subvision says a CAT scan remains necessary during digging.[3][2]

Advertisement

Agree CAD and report acceptance before commissioning

Make the CAD files and supporting report part of the acceptance brief, not just the PDF’s appearance. Agree these requirements in writing:

  • References and formats: coordinate system, vertical reference, CAD and PDF formats.
  • Drawing conventions: achieved-quality labels, depth presentation and how changes in evidence are marked.
  • Coverage: survey boundaries, exclusions and inaccessible areas, with cross-referenced report notes.

Before accepting delivery, check critical design interfaces against the quality labels, depth notes and report limitations. Return unresolved discrepancies as queries rather than treating drawing completeness as evidence of resolved utility positions.

Ask Spacion, Subvision and Groundwise to confirm coordinate and vertical references, acceptance procedures and revision terms in writing.[1][2][3] Groundwise offers free support from qualified industry experts [3]; ask about the query window, revision and reissue charges, and responsibility for updates after site changes, and ask the other providers who handles queries.

Advertisement

Compare price and programme after matching scope

Groundwise lists desktop utility searches from £100 + VAT for a standard 10-day turnaround, or £150 + VAT for its quick service, described as ASAP up to three days. These are starting prices for records searches—not universal fixed quotations or prices for field detection or physical verification.[3]

Ask Spacion and Subvision for project-specific survey prices and turnaround times.[1][2] Subvision says Type D timing depends on utility-company responses and recommends early booking for tight programmes; it confirms scope before supplying a quotation and timescale.[2]

Compare quotations after matching survey extent, investigation methods, reporting requirements and allowances for verification. Ask for the project-specific programme, exclusions and cancellation terms in writing.

Choose by scope and issue a commissioning checklist

Groundwise suits the initial desktop-records stage, not field detection or verification.[3] Spacion describes coordinated DWG/PDF drawings and achieved classifications against findings.[1] Subvision gives more explicit detail about documenting unmeasured depths, inaccessible areas and detection limitations.[2]

Use this final checklist as client requirements to agree, rather than assuming every item is included:

  • Purpose and extent: state the intended design use, boundary, access arrangements and critical interfaces.
  • Specification and scope: name the PAS 128 edition and agree the D/C/B/A tasks, separating requested quality from achieved quality.
  • Finding-level evidence: require achieved-quality labels against each finding or route segment, distinguishing measured and unmeasured depths.
  • Visible gaps: require inaccessible areas, detection limitations and exclusions on drawings and in the report.
  • Handover: agree the coordinate system, vertical reference, file formats and report contents.
  • Follow-up: identify unresolved critical interfaces and specify targeted detection or physical verification before fixing affected design decisions.

At acceptance, ask: “Can the design team identify what is established, what remains unresolved and what further work is needed at each critical interface?” For unresolved crossings or foundation interfaces, request a written follow-up scope and agree who will review the results; Subvision identifies these as potential locations for physical verification.[2]

References

  1. PAS 128 Utility Surveys & Underground Service Mapping | Spacion (spacion.co.uk)
  2. PAS128 Surveys & Utility Mapping UK | Subvision Surveys (subvisionsurveys.co.uk, 2026)
  3. PAS128 D Utility Searches | Utilities Survey | Groundwise (groundwise.com)
Advertisement

Similar reads