HROUS

Traffic Count Survey Comparison for Australian Planners

Advertisement

Compare TDC’s stated MetroCount and video capabilities with Austraffic’s video-count services against the road volumes or turning movements your assessment needs—not the general label “traffic count survey”. [1][2] Specify whether the brief requires continuous directional road-volume data, selected-period intersection movements, or both, then agree the coverage and handover for each dataset.

Top-down aerial view of a green park with intersecting roadways and traffic, captured on a sunny day.
Advertisement

Compare TDC and Austraffic

TDC

Location coverage: TDC says it has manual data-collection staff across Australia where video is unsuitable. This is a statement about manual coverage, not a commitment to every survey method at every site. [1]

Observation hours and movement reporting: TDC identifies MetroCount road-side units and high-mast video for midblock surveys. Its turning-movement cameras cover intersections, midblocks and roundabouts, with queueing and delay observations available. Cameras can record continuously for 24-hour periods or for shorter periods such as traffic peaks. Turning movements are generally reported in 15-minute intervals, using light/heavy, Austroads or client-adjusted classifications, including separate roadway and footpath bicycle classes. [1]

Auditable data handover: TDC expressly supplies interactive reports and original camera footage for audit and verification. Classification reporting can include multi-day spreadsheets. [1] Agree technical file formats and missing-interval protocols in the brief.

Advertisement

Austraffic

Location coverage: Confirm Austraffic’s coverage for the proposed sites before booking. [2]

Observation hours and movement reporting: Austraffic identifies video-count technology and observation up to 24 hours a day, dependent on site conditions. Services include turning-movement, roundabout, midblock, queue-and-delay, pedestrian and bicycle surveys. Data is typically collated into 15-minute blocks, with customised intervals available and calculated peak-hour results presented with the counts. Classification options include light/heavy and 12-bin Austroads breakdowns. [2]

Auditable data handover: Austraffic describes video-based review, audit and verification, with controls governing footage access and destruction of files at project end. That audit capability is not an express commitment to deliver video files to clients. [2] Ask for the agreed access arrangements, delivery formats and missing-interval reporting in its proposal.

Advertisement

Match the method to the assessment

Treat road-section volumes and intersection turning movements as separate requirements rather than assuming one dataset supplies both. The following examples are commissioning requests, not prescribed survey standards:

  • Road-section volume brief: “Count vehicles passing the nominated midblock location, separately by direction, throughout the agreed continuous survey period.” TDC’s MetroCount and high-mast video methods provide a starting point for discussing equipment, rather than a complete specification for directional outputs or a particular tube configuration. [1]
  • Intersection turning-movement brief: “Count the nominated approach-to-exit movements during the agreed assessment periods, with queueing and delay observations where required.” Both providers offer turning-movement services; TDC describes queueing and delay capture, and Austraffic lists roundabout and queue-and-delay surveys. [1][2]
Advertisement

For a road-volume brief, request a proposal specifying equipment, continuous observation duration, direction-separated counts, classifications and aggregate outputs. Austraffic also lists midblock surveys. [1][2] Ask both providers to confirm the proposed equipment and continuous directional-volume deliverables rather than assuming equivalence.

For intersection turning movements, both providers’ stated services support shortlisting them, subject to site coverage and the required observation windows. [1][2] If client-held source footage is essential, TDC’s explicit supply commitment is a documented distinction from Austraffic’s audit capability. [1][2]

For a combined brief, request separately scoped road-section and intersection outputs, even when commissioning one supplier. Ask the proposal to explain how each dataset will be collected and reported. Choose against those commitments, rather than an overall provider ranking these service descriptions cannot support.

Advertisement

Lock down locations, hours and movements

Attach a site and movement diagram marking each road section, intersection approach, direction and turn, plus any pedestrian or bicycle movements required. Ask the supplier to return an agreed coverage diagram distinguishing requested observations from confirmed coverage.

Keep these fields separate rather than hiding them in “peak-period survey”:

  • Dates and hours: nominate survey dates, start and finish times, and continuous or selected-period observation. State whether multiple periods or days are required.
  • Reporting interval: specify the time blocks required in the results, separately from recording duration.
  • Movements: identify each direction and approach-to-exit movement, including any pedestrian or bicycle movements.
  • Classifications: define the categories needed and ask the supplier to confirm how they will appear in the results.
Advertisement

Use the providers’ generally or typically 15-minute reporting as a comparison point, not a mandatory standard; Austraffic expressly allows customised blocks. [1][2] Where active-transport detail matters, TDC’s client-adjusted classes include pedestrians and separate roadway and footpath bicycle categories. [1]

Ask both providers to confirm school-day requirements, holiday or weather exclusions, seasonal adjustments and minimum peak windows. [1][2] Put weekday or weekend selection, school and holiday context, weather or disruption exclusions, and resurvey conditions into the agreement. Leave equipment deployment and applicable approvals to project-specific arrangements rather than prescribing public-road placement.

Advertisement

Agree how gaps and exclusions will be reported

Ask TDC and Austraffic to agree completeness thresholds, gap flags, outage logs, imputation rules, treatment of partially recorded intervals and re-count triggers. [1][2] Make these acceptance requirements explicit before booking.

Request an interval-status field distinguishing:

  • Recorded zero: observation took place, with no relevant movements counted.
  • Missing: no usable observation is available for the interval.
  • Partially recorded: observation covers part of the interval, with that portion identified.
  • Excluded: the period was deliberately left out, with the reason stated.

These are proposed acceptance requirements, not published features of either provider. For each gap or exclusion, request affected start and end times, the reason, and relevant weather or disruption notes. Ask for estimated or adjusted values to be separated from observed counts, with the agreed calculation method documented.

Agree who decides whether affected periods remain usable, require replacement observation or trigger another remedy. Set completeness requirements against the assessment’s needs and record the response to equipment failure. Do not assume an automatic entitlement to a re-count.

Advertisement

Specify an auditable data handover

Request raw aggregate count tables by agreed interval, site, direction or turning movement, and class, alongside the summary report. Carry the agreed gap and exclusion rules into these tables rather than leaving exceptions in a separate narrative.

Ask for a supporting pack containing:

  • A data dictionary explaining fields and codes, plus the timestamp convention.
  • Site and movement diagrams and collection-method notes.
  • Weather or disruption notes and a gap or exclusion register linked to affected intervals.
  • The agreed treatment of partial intervals, estimates and adjusted values.

Ask both providers to confirm technical delivery formats. [1][2] Ask suppliers to name the spreadsheet, machine-readable data, report and video formats they will deliver, rather than accepting “data and report” as the handover specification.

Audit access is not file delivery. TDC expressly supplies original camera footage for intersection turning movement surveys; Austraffic describes controlled access and video-based verification without promising client video files. [1][2] Record footage availability, access conditions, retention and permitted use in writing. Agree raw-count ownership, delivery deadlines and review or revision arrangements, and keep requested count data aggregated rather than seeking identifiable road-user information.

Advertisement

Check accuracy claims and commercial terms

Austraffic claims determination of up to 99% of survey events, dependent on site conditions. This is a vendor claim, not an unconditional accuracy guarantee; ask Austraffic for independent validation. [2]

TDC’s cited page gives no numerical accuracy rate, so the two pages do not support a direct accuracy ranking or comparable gap-handling guarantees. [1][2] Ask each supplier how it will validate counts at the proposed sites, document exceptions and demonstrate that the agreed coverage was achieved.

Request a written quote setting out price, inclusions, quote basis, minimum spend, booking lead time and cancellation or refund terms. Include the agreed remedies for coverage shortfalls and delivery commitments. Compare those written terms alongside the method and outputs, not separately from them.

Send one commissioning checklist

Separate the provider’s published capabilities from the commitments requested for this project:

  • Assessment: identify the decision, sites and need for directional road volumes, turning movements or both.
  • Coverage: attach diagrams and specify dates, observation hours, directions, movements, classifications and reporting intervals.
  • Capability confirmation: ask the supplier to explain how its stated methods apply to the nominated sites and datasets.
  • Completeness: agree weather and disruption notes, excluded intervals, missing and partial-interval flags, and remedies for coverage shortfalls.
  • Handover: specify raw aggregate tables, metadata, technical formats, footage supply or access, delivery dates and review arrangements.
  • Commercial acceptance: obtain the price, inclusions, lead time and cancellation terms in writing.

Treat the checklist as requested scope, not a promise every item is included. Choose the proposal that explicitly meets the assessment and handover requirements.

References

  1. Traffic Surveys | Transport Surveys | TDC Traffic Control & Data (trafficdc.com.au)
  2. Edit ATS Public Page Intersection Turning Movements | Austraffic (austraffic.com.au)
Advertisement

Similar reads