HROUS

Tell-Tale Crack Monitor Choice for UK Property Owners

Advertisement

For a flat crack location, the Avongard Plus provides two-axis monitoring; for a corner, have the surveyor or structural engineer specify a suitable arrangement before buying.[2][3] First confirm who must take the readings and what evidence the requesting party will accept.[3][4]

Advertisement
Detailed close-up of a cracked blue wall texture, revealing surface imperfections.

Seek professional advice promptly if cracking is new or worsening. If you suspect immediate danger, keep clear of the affected area and report the dangerous structure to the relevant local authority. A scheduled reading can wait while you seek help. [4][5]

Confirm whose readings will be accepted

Separate the evidence requirements from optional record-keeping aids before monitoring starts:

Advertisement
  • Requirements to agree: the cracks to monitor, who takes readings, who interprets them, the reading programme and what the insurer, lender, buyer or buyer’s solicitor will accept.[3][4]
  • Core record: exact location, gauge reference, packaging batch number, baseline crack width, starting X/Y position, subsequent dated readings and photographs.[1][3][4]
  • Optional organisational aids: an email confirming responsibilities, a packaging photograph and consistent photograph filenames.

Tell the monitoring professional what you have seen, when the cracking appeared and any changes noticed. Send photographs and the requester’s original instruction so the professional can address the question being asked.[3]

Do not assume a careful home log will qualify as formal stability evidence. Laytoe says independent engineer readings and interpretation are usually requested; Nivek’s guide states home-logged data will not be accepted as formal stability evidence.[3][4] These statements differ in strength: check the actual requester’s requirements rather than treating either as a universal rule.

Record the agreed responsibilities in writing. Collecting observations is separate from interpreting the series: leave conclusions about historic, seasonal or ongoing movement to the surveyor or structural engineer.[3][4]

Advertisement

Choose a gauge for the mounting position

  • Flat location — Avongard Plus Tell-Tale: a millimetre-calibrated bottom plate overlaps a transparent upper plate with a cross-shaped hairline cursor. The horizontal range is ±25 mm and the vertical range is ±10 mm.[2]
  • Corner location — professional specification needed: before buying, ask the surveyor or structural engineer to specify a suitable corner-monitoring arrangement. Check the specified model’s manufacturer instructions for its fixing method, measurement range and reading method.

The Plus can be fixed with screws or epoxy, which are sold separately. It comes with fitting instructions and a monitoring record sheet. Avongard states an accuracy of ±1.0 mm when reading the scale and ±0.1 mm when measuring the spigots with callipers. Agree which reading method meets your surveyor’s requirements. [2]

Advertisement

Before ordering, agree:

  • Geometry: whether the mounting faces are flat or meet at a corner, with one plate on each side of the crack.[2][3]
  • Fixing: whether the surface will hold screws or needs bonding; Laytoe selects the method to suit the surface.[3]
  • Exposure: whether the position is indoors or outdoors. Laytoe uses both, but that does not establish a weather-resistance rating for the Plus.[2][3]
  • Reading method: visual scale, calliper or repeat photograph.[2][3]

Purchasing note: Avongard lists 24 ml Araldite Rapid Epoxy at £8.95, fixing screws at £1.50, its Crack Monitoring Kit at £149 and its Home Monitoring Kit at £95.[2] These are accessory and kit prices, not a quoted Plus unit price.

Identify each gauge and record its baseline

Avongard’s record sheet includes project, location, Tell-Tale reference number, Tell-Tale batch number and reading dates. The reference is a number added to the gauge; the batch number comes from its outer packaging.[1] Copy it before discarding the packaging.

Advertisement

Make the location specific enough to distinguish neighbouring cracks. Laytoe’s final monitoring material identifies both the monitored building areas and individual gauge locations.[3] Using the same gauge reference in the log, location sketch and photograph filenames is a useful organisational safeguard.

Record the original crack width separately from the gauge’s starting position. The gauge tracks relative movement at that location. Give the surveyor the visible pattern, when the crack appeared and any associated changes. [2][3][4]

  • For the baseline crack width, Nivek recommends measuring at the widest point with a crack width gauge costing around £10 from surveying suppliers.[4] Laytoe usually places gauges at the most informative part, generally the widest point.[3]
  • Starting position: record the actual X (horizontal) and Y (vertical) readings and photograph the starting position.[3][4] Follow the supplied model instructions and agreed installation method.[2][3]
  • Repeat-photo position: describe where the photograph was taken and the direction of view. Laytoe photographs each gauge from the same position on return visits.[3]

Once monitoring begins, do not move, knock or paint over the gauge: Laytoe warns this spoils the readings.[3]

Advertisement

Keep a consistent reading log

Use one identification block and reading log for each gauge. This log combines Avongard’s fields with baseline measurements, X/Y readings and repeat-position photographs.[1][3][4] Reader name, time and photograph filename are suggested organisational additions.

Gauge identification block

  • Project/property: record the project or property name.
  • Monitored area and exact location: identify the building area and the gauge’s precise location.
  • Gauge reference: record the reference assigned to the gauge.
  • Batch number from outer packaging: copy the batch number from the packaging.
  • Baseline date and crack width (mm): record the date and initial crack width in millimetres.
  • Starting X and Y (mm): record both starting readings in millimetres.
  • Photo-position ID and direction of view: identify the photograph position and describe the viewing direction.
  • Gauge orientation/location-sketch reference: note the orientation and the reference for the location sketch.

Avongard’s record sheet uses “+” for opening and “−” for closing on the horizontal scale; do not apply this as a vertical-direction rule.[1]

Advertisement

Reading entries

Use the method you agreed with your surveyor. For a visual reading, note the cursor’s X and Y positions and record a photo from the same spot. For calliper readings, record the specified spigot measurements as calliper results in a separate field. Agree any change of method with the surveyor before comparing results. [1][2][3][4]

  • Label the baseline and each later entry. Record the date, time, reader, method, measurements in millimetres and photograph reference. Use a cursor sketch with a visual reading. Label calliper results with the measurement points used.

Keep observations descriptive, not diagnostic.

Agree the schedule and professional review date

Agree the programme before routine readings begin. Nivek suggests four to eight weeks between home readings. For readings that will be used as formal evidence, ask the interpreting professional to set the schedule. [3][4]

Advertisement
  • Named reader: who takes readings and whether independent professional readings are required.[3][4]
  • Interpreting professional: who assesses the series.[3][4]
  • Programme: visit dates or frequency, an interim review date and an intended monitoring end date.[3]
  • Handover: recipient, delivery date and agreed format for readings, photographs and interpretation.[3]

A minimum home-log period does not establish stability. Nivek recommends readings for at least 12 weeks.[4] Laytoe describes monitoring over several months to capture seasonal change; its own certificate requires a full year and is issued only if readings show stability.[3] These are provider recommendations and service conditions, not a single timetable applying to every property.

As a service example, Laytoe’s Greater London package starts at £2,100 for twelve months, including the initial inspection and gauge installation, return readings and photographs, a conclusion, repair advice and its certificate if readings are stable. Prices are guides and VAT may be added.[3] Treat the intended end date as a review point, not a guaranteed favourable conclusion or third-party acceptance.[3]

Refer new or worrying changes to the qualified professional promptly rather than waiting for the scheduled handover.[3][4]

Advertisement

Hand over a complete record

Link the gauge identity, location, baseline, dated readings and repeat-position photographs so the professional can interpret the record.[1][3][4]

Illustrative dated handover

Fictional example: the details and measurements below illustrate an interim submission, not a recommended interval or evidence of stability.

  • Property/location: Example Property; rear reception room, internal rear wall beside the left window reveal.
  • Gauge: TT-01; packaging batch EXAMPLE-BATCH-01, copied from the outer packaging.
  • Photo position: P1, square-on from a marked observation position, facing the internal rear wall.
  • Baseline — 2 November 2026: crack width 1.0 mm; starting X 0.0 mm, Y 0.0 mm. Image: TT-01-2026-11-02-P1.
  • 9 November 2026: X 0.0 mm, Y 0.0 mm. Image: TT-01-2026-11-09-P1.
  • 16 November 2026: X 0.0 mm, Y 0.0 mm. Image: TT-01-2026-11-16-P1.
  • Notes: no disturbance or missing readings recorded.
  • Handover and agreed interim review — 23 November 2026: Example Surveyor to review the home readings as interim observations; no third-party acceptance assumed.

Include: the identification block and packaging-batch record; baseline measurement and image; starting gauge position; complete dated log; repeat-position photographs; and identification of every monitored area and gauge location.[1][3][4]

Useful administrative additions are a location plan, photograph index, notes of disturbance or missing readings, and the written agreement about evidence acceptance and review.

Before handing over, check that each image and reading matches the right gauge and location. Name the person interpreting the readings and identify the agreed review date. Ask that professional to assess the cause, safety and any need for further investigation. [3][4]

References

  1. Avongard — Plus Tell-Tale Crack Monitoring Record (avongard.com)
  2. Avongard — Plus Tell-Tale Product Specification (avongard.com)
  3. Laytoe Structures — Crack Monitoring Surveys in London (laytoe.co.uk)
  4. Nivek Surveyors — How to Monitor Wall Cracks at Home (niveksurveyors.com)
  5. GOV.UK — Report a Dangerous Building or Structure (gov.uk)
Advertisement

Similar reads