Define the handover before choosing a contractor

Choose a contractor against a written handover checklist: require construction records, pre-test records, numeric measurements and interpretation, and price additional deliverables explicitly. These are proposed procurement requirements—not a claim that every test package includes them.

Advertisement
Captivating geothermal steam rising across a picturesque mountain landscape under clear skies.

Geosource Energy’s 2017 Toronto report provides a historical example of borehole documentation and thermal-test interpretation.[2] Use it to distinguish report content from additional files to request:

  • Drilling and installation: the report includes borehole location, drilling log, dimensions, geology, casing, loop and grout construction.[2]
  • Pre-test and instruments: it documents water filling, air purging and test equipment.[2] Request pre-circulation temperature records, sensor identification, calibration records and accuracy tolerances separately.
  • Measurements and events: it includes temperature, power and flow graphs, test timing and logging interval.[2] Request the underlying numeric time-series in an agreed format and an interruption/event log.
  • Interpretation: it includes the analysis method and window, conductivity, borehole resistance, temperature and estimated diffusivity.[2]

Attach a responsibility list to the quote request: who supplies each item, who checks it and when it reaches the authorised designer. Keep drilling and installation records distinct from the thermal-response service, even if one contractor coordinates both.

Advertisement

Assign responsibility for the borehole record

Ask the driller and loop installer to supply their construction records, and the testing contractor to identify which construction inputs it used in the interpretation. Request:

  • A borehole identifier and site-plan location.
  • Final depth, dimensions and geological log.
  • Casing dimensions and depth, plus drilling method.
  • Loop specifications and installation depth.
  • Grout product, mix and placement records.

Geosource’s report documents these types of construction information alongside the thermal test.[2] It records a 184 m borehole, locates it on an appendix site plan, and describes a full-depth, fusion-welded HDPE U-tube and high-solids bentonite grout with PowerTecX, pumped through a tremie line.[2] These are examples of records to request, not construction specifications for another property.

Separate material estimates from measured formation results. The report’s grout conductivity of 2.1 W/(m·K) was estimated from manufacturer mix recipes; it was not the site-measured formation conductivity.[2]

The 2017 report pairs a casing depth of 110 ft with 39.6 m. The direct conversion of 110 ft is about 33.5 m. For design inputs, have the responsible contractor reconcile the units with the original borehole log and record the correction. [2]

Advertisement

Confirm pre-test conditions and instrument records

The Toronto report records that the loop and test unit were filled with water and purged of air before testing.[2] Request a documented pre-test sequence, including a temperature record before circulation begins.

An equipment description is not the same as instrument documentation. The report describes the testing equipment, but the cited report does not include a pre-circulation temperature record, sensor serial numbers, calibration dates or certificates, or accuracy tolerances.[2] Put these additional deliverables in the scope:

  • Instrument identifiers and sensor locations linked to measurement channels.
  • Calibration dates or certificates, stated accuracy tolerances and the agreed logging interval.
  • Named responsibility for power, access, attendance, operational monitoring and recording deviations.

Ask the driller to include relevant field observations in the site record. Agree who receives the observations and how they affect the test or drilling plan for the proposed site. [2]

Agree test-acceptance criteria and repeat-test triggers with the designer before commissioning. Do not insert a supposedly universal duration, calibration requirement or pass/fail threshold.

Advertisement

Ask for numeric measurements, not just graphs

Geosource’s test recorded measurements every two minutes over 54 hours and six minutes.[2] Its figures plot temperature, power and flow against time, plus mean circulating-fluid temperature against logarithmic time.[2] The cited report does not provide the individual numeric dataset, a delivery format or an interruption log.[2]

Make these proposed requirements explicit rather than assuming they accompany the graphs:

  • A designer-agreed data file: specify CSV or another accepted format, with timestamps, units, variable definitions and measured versus calculated fields clearly identified.
  • An event log: request interruptions, restarts, equipment changes and excluded measurements, linked to timestamps. Ask for an explicit “no events recorded” statement where appropriate.
  • A traceable interpretation: require the actual analysis window, reasons for exclusions and a connection between selected measurements and reported results.

The Toronto report names Ground Loop Design (GLD) 2016 as its analysis software and identifies hours 12–48 as the window used to calculate conductivity.[2] Ask the contractor to document its choices—not copy that window—so the designer can inspect which measurements informed the interpretation.

Advertisement

Check which results support design

Request labelled design inputs for thermal conductivity, borehole resistance, temperature and estimated thermal diffusivity, all categories included in the Toronto report.[2] For each, ask for units, the calculation or interpretation method, and a label showing whether it was measured, derived or assumed. Keep generic geological assumptions separate from site-test interpretations and manufacturer-based material estimates.

The test report is not a final borefield design. Geosource says its drilling log and test results can be combined with the building energy model to size the ground heat-exchanger field and assess construction cost.[2]

The results come from one location, conditions may vary, and the measured response integrates formation conductivity, groundwater conductivity and groundwater movement.[2] Have the designer assess whether the tested location adequately represents the proposed borefield and whether remaining uncertainties warrant further investigation.

Advertisement

Separate drilling, equipment, attendance and reporting prices

Ask for component pricing rather than an unexplained total. Egmond Associates Ltd. (EAL) illustrates an itemised commercial structure; EAL’s About page reports completed investigations across Canada and the United States, including Ontario and Quebec.[1][3] It is a pricing example, not a confirmed Toronto service option.

EAL lists these typical components in Canadian dollars:

  • “Pre Geology”: $3,000.[1]
  • Retaining a driller for the client: $20,000 to over $40,000, depending on depth.[1]
  • Test equipment—Geocube, generator and fencing: $4,000–$8,000.[1]
  • Site visit during testing: $1,500.[1]
  • Test analysis and report: $1,500–$4,000.[1]

These figures exclude taxes, assume unfettered site access and vary with site conditions and client requirements; EAL calls for a project-specific estimate or custom quote.[1] EAL prepares thermal conductivity test reports and says clients pay subcontractors, including drillers and laboratories, and government fees, while describing its estimates as combined EAL and supplier costs.[1] Ask the quote to identify who performs each task and clarify how supplier charges are included so they are not counted twice.

Before accepting a quote, establish where loop installation, grouting, mobilisation, attendance, repeat testing and data files sit: included in a named item, separately priced or excluded. Ask what “Pre Geology” covers. Do not add the published components into a promised all-in package.

Advertisement

Tie payments to a written delivery schedule

EAL’s schedule calls for suppliers and EAL to receive 50% in advance, 25% on the day of field work and 25% before report delivery—that provider’s terms, not a Canadian industry-wide rule.[1]

Ask for a delivery schedule identifying what documentation accompanies each payment milestone. Because the final payment precedes report delivery, negotiate whether the designer can review a draft and file inventory for completeness first. Specify who corrects missing deliverables and by when.

The cited EAL page does not establish cancellation, refund or equipment-failure protections.[1] Request written scheduling, cancellation, refund and repeat-work terms, including responsibility for extra charges if testing restarts.

Confirm in the agreement who may receive and use the report and underlying files. The Toronto example includes restrictions on use and transfer. Specify permission for the project’s designer and anyone else who will need the data. [2]

Advertisement

Approve the scope before commissioning

Have the designer approve the written scope—not only the quotation—before authorising fieldwork. Resolve these points at sign-off:

  • Site and responsibilities: approve the project address, pilot-bore location, construction specification, responsible parties, access arrangements and test procedure.
  • Deliverables: name construction records, pre-test records, measurements, event logs and interpretation, with file formats, recipients and delivery dates.
  • Commercial terms: confirm inclusions, exclusions, taxes, subcontractor responsibilities and payment dates. Assign costs for repeat attendance, extended testing or replacement analysis.
  • Permissions and suitability: assign responsibility for applicable permits and approvals, and request evidence of qualifications and insurance. EAL offers permit support.[1]
  • Design use: confirm how the designer will use the single-location results alongside the building energy model, and identify remaining uncertainties.[2]
Advertisement

Resolve missing responsibilities and unagreed data delivery before authorising the work.