Choose a temporary dust barrier using the measured ceiling heights, the agreed access route and the requirements for removing the system. For EX-4KIT, Protrade publishes 1.5 m at rest and extension to 3.9 m. Ask for the minimum installed height at your opening. [2]

Advertisement
Blurred image of a woman pressing her hand against a translucent plastic sheet, creating a surreal effect.
  • Pole-and-film option: Protrade Extender Wall uses spring-loaded poles and separately purchased containment film. Its listed zipper dimensions do not establish the clear doorway opening.[2]
  • Rigid options: Trumark’s ZoneFX 300 requires top- and base-track fixing/support; ZoneFX 1200 uses weighted supports without fixings.[1]

Before ordering, resolve the opening, doorway, seals and surface-protection conditions below. Keep optional spares separate from components needed to complete the barrier.

Advertisement

Measure the opening and plan the doorway

Prepare an annotated sketch showing floor-to-ceiling measurements along the barrier, the overall run, ceiling finish, obstructions and doorway location. This is a planning checklist, not a manufacturer-prescribed measuring procedure.

Compare the proposed installed height with every floor-to-ceiling measurement on your sketch. Protrade markets extra-tall 6 m kits. Request the installed range for the exact poles on your quote. [2]

Include film in the order. Protrade specifies containment film is required for proper use but excludes it from EX-4KIT. Separate bulk rolls are available in 3 m and 4 m heights.[2] Request the proposed film arrangement for a taller installation rather than assuming these rolls resolve it.

Advertisement

Pole reach is not wall coverage. Ask Protrade to confirm assembled barrier width, pole spacing, extra-tall film configuration and finished doorway clear dimensions.[2] Request a layout covering the full run and doorway.

Protrade lists a zipper 72 mm wide and 2.1 m high. Ask for the clear passage dimensions of the assembled opening separately. [2]

Add these access requirements to the sketch:

  • Position: show where the agreed route crosses the barrier and how people approach and leave the opening.
  • Users and loads: identify who needs access and the equipment, stock or other items passing through.
  • Clear opening: record the project-required usable width and height separately from zipper dimensions.

Keep selection provisional until the proposed doorway accommodates the agreed route.

Advertisement

Compare pole-and-film systems with rigid partitions

Compare support, sealing and access together. A no-fixing requirement narrows the choice, but does not settle the doorway or edge-sealing detail.

  • Protrade Extender Wall: spring-loaded poles support containment film, with tapes used in the assembly. Specify edge sealing separately and request a layout showing coverage, pole spacing and the clear opening.[2]
  • Trumark ZipWall: adjustable, spring-loaded poles hold sheeting to form a barrier. Request the proposed kit contents, pole reach, surface contacts, edge seals and doorway dimensions; do not borrow Protrade’s specifications.[1]
  • ZoneFX 300: Trumark describes a fixed, fully sealed tongue-and-groove PVC system requiring top- and base-track fixing/support. Consider it where those fixings are acceptable, with wall and door dimensions specified.[1]
  • ZoneFX 1200: freestanding construction uses weighted supports without fixings. Trumark states that it should be used with ZipWall kits for complete dust containment.[1] Request a combined support and sealing layout, kit contents and clear door dimensions rather than carrying across the 300’s “fully sealed” description.

The cited Trumark catalogue does not state ZipWall kit contents or pole reach.[1] Trumark describes ZoneFX generally as reusable and relocatable, with single or double doors and windows available; those options alone do not establish a suitable clear opening.[1]

Choose against the sketch: permitted fixings, available support space, ceiling contact, seals and access—not simply flexible versus rigid construction.

Advertisement

Specify edge seals and protect contact surfaces

Mark every ceiling, wall and floor interface on the sketch and assign a proposed sealing method. Ask for configuration-specific details rather than assuming the kit supplies a universal solution.

EX-4KIT includes two top seal rails as well as these tapes:[2]

  • 48 mm Bock Washi Premium Painters Tape.[2]
  • 48 mm Bock Filament Plastic Joint Tape—marked “not clean removal”.[2]
  • 24 mm Bock Tearable Double-Sided Cloth Tape—also marked “not clean removal”.[2]

For the double-sided cloth tape, Protrade instructs users to pre-tape the surface with Bock Washi Premium Masking Tape.[2] Carry this instruction into the installation scope; do not treat it as a damage-free removal promise. Identify each contact surface and request adhesive-compatibility advice before settling the seal.

Protrade also lists an eight-pole alternative with top seal rails.[2] For either kit, check the supplied rail layout and dimensions against the ceiling interface before ordering.

Separate components needed to complete the seals from optional contingency stock. Spare film, tape and sealing components belong on distinct order lines.

Advertisement

Match surface protection to removal conditions

Keep barrier sealing, floor protection and control of tracked dry contamination as separate specification items. Trumark lists adhesive films, sheets, foam-backed protection and tacky entrance mats with different purposes and product-specific conditions.[1]

Select for the substrate. Trumark identifies SupaTak 800 as carpet-only and specifies four-week removal limits for relevant adhesive films—not every protection product in the catalogue.[1] Trumark lists GripStick Blue Masking Tape as peeling off most surfaces without residue up to 14 days after application.[1] This is a tape-specific condition; do not apply it to adhesive floor films or other protection products.

For the access route, Trumark describes TakMat as a low-profile 913 mm × 913 mm dust mat intended for use under doors and to contain dry contamination tracked or wheeled towards clean areas.[1] That is the mat footprint, not a doorway dimension. Specify it separately from the barrier seals and broader floor protection.

Record the product, substrate, application date, applicable removal limit and any test-area instruction in the work scope.

Advertisement

Compare published kit costs on the same basis

Protrade’s listed kit prices on 23 November 2026 are shown by model. Request a current quote with GST and delivery stated separately. [2]

  • EX-4KIT: A$409.35 including GST / A$372.14 excluding GST.[2]
  • Eight-pole kit with top seal rails, 3.9 m: A$594.75 including GST / A$540.68 excluding GST.[2]
  • Extra-tall 6 m four-pole kit: A$599.56 including GST / A$545.05 excluding GST.[2]
  • Extra-tall 6 m eight-pole kit: A$877.66 including GST / A$797.87 excluding GST.[2]

Trumark’s catalogue gives no ZipWall or ZoneFX prices. Request the total price for the proposed system and compare it with the equivalent Protrade assembly. [1][2]

EX-4KIT is not a complete barrier price: required containment film is separate, and the optional film add-on’s price must be checked in the cart.[2] Confirm film inclusion for the other kits rather than carrying that assumption across.

Request an itemised quote for each option, consistently including or excluding GST:

  • Kit and required containment film.
  • Seals and sealing accessories.
  • Floor and surface protection.
  • Optional spares.
  • Delivery. Confirm coverage, available delivery windows and total cost for the site address.
  • Agreed removal work.

Leave unresolved amounts blank rather than treating them as zero. Compare the completed scope, not the kit subtotal.

Advertisement

Agree removal responsibilities before installation

Neither cited page sets out an end-of-fit-out removal procedure.[1][2] Trumark’s description of ZoneFX as reusable and relocatable is not an agreed dismantling scope.[1]

As project precautions, record these responsibilities in the quote or work scope:

  • Who removes the barrier, tapes and surface protection.
  • When each product comes off, using its specific removal limit rather than one deadline for everything.
  • Who checks exposed finishes and handles residue or damage.
  • The existing surface condition, preferably with photographs, and any agreed trial application.

Carry the tape warnings, protective pre-taping instruction and surface-protection removal conditions into that agreement.[1][2] This responsibility list is a recommended project arrangement, not a manufacturer-prescribed procedure.

Advertisement

Specification checklist before ordering

Attach the opening sketch and removal agreement to the order. Keep unresolved dimensions visible rather than treating them as allowances.

Selection conditions to resolve

  • Opening: measured heights and barrier run, ceiling and adjoining finishes, obstructions and doorway location.
  • Access: agreed clear width and height, intended users and items passing through.
  • System: selected kit, film arrangement, support layout and permitted fixings.
  • Seals: ceiling, wall and floor details, including any rails and protective pre-taping.
  • Protection and removal: selected products, surface conditions, removal dates and named responsibilities.
  • Quote: complete scope on a consistent GST basis, with unresolved amounts identified.

Manufacturer-stated use conditions

  • Reach and film: match poles to their published reach; EX-4KIT requires separately purchased containment film.[2]
  • Adhesives: retain the Washi pre-taping instruction beneath double-sided cloth tape and both “not clean removal” warnings.[2]
  • Surface protection: retain product-specific surface restrictions, test-area advice and removal limits.[1]

Optional additions

  • Itemise contingency film, tape and sealing spares separately.
  • Include tracking-control products only where selected; TakMat is intended for dry contamination carried or wheeled towards clean areas.[1]

For an ordinary, nonhazardous fit-out, shortlist systems that fit the opening, maintain the site’s required access and egress, and have a clear plan for sealing and removal. Have the site safety lead review the layout before installation.