Before accepting and concealing newly installed service-penetration fire stopping in England, check the contract’s inspection requirements and collect evidence linking each opening to its system, installation, inspection findings and corrections.[2][3][4] Separate the requirements from the recommendations:

Advertisement
Engineers wearing hard hats and masks review a construction blueprint on a laptop indoors.
  • Contract requirements: Quelfire says whether inspection is required depends on the individual contract; its guidance does not establish a universal statutory pre-concealment hold point.[3]
  • System evidence: Quelfire says its standard installation details should be checked against supporting test evidence, certification and installation instructions.[4]
  • Recommended assurance: Quelfire recommends independent inspection and, where inspection is required, progressive before, during and after photographic reporting.[3]
Advertisement

1. Establish the project’s inspection and acceptance arrangements

Before assessing individual seals, identify the inspection scope, acceptance criteria, responsible parties and any agreed closing-up hold points. Treat this as a project-management checklist, not a prescribed statutory process, and distinguish contractual requirements from additional assurance measures.[3][4]

Keep construction acceptance separate from fire-risk assessment. ASFP’s 2012 guide distinguishes fire-risk assessment from Building Regulations compliance checking, which it assigns to building control. This historical guidance is not a current prescription for the project’s acceptance procedure.[1]

Keep three functions separate in the project arrangements:

Advertisement
  • Manufacturer technical support: Quelfire provides tested-detail tools, installation guides, certification and project-specific support to help identify a tested solution. That support is not independent acceptance of installed work.[3][5]
  • Inspection: Quelfire says it does not inspect or sign off its installed products and recommends independent third-party inspection. This is Quelfire’s position, not a policy to assume every manufacturer follows.[3]
  • Acceptance: Record who is authorised under the project arrangements to accept the work. The cited guidance does not identify a universally required final signatory.[2][3]

Document the inspector’s scope, the report they will provide and who will use it to record the acceptance decision.[2][3] Do not treat installer records, contractor accreditation or product certification as substitutes for installation-specific evidence. BSML describes accreditation as adding credibility to records, but this vendor claim does not establish authority to accept the project’s work.[2][3][4]

Advertisement

2. Identify each opening and the applicable system

Give each opening a project reference linked to its location on the as-built compartmentation drawing. This is a practical recommendation, not a prescribed register format: it brings together BSML’s recommendations for location, product and installer records.[2]

Keep the opening reference separate from the manufacturer’s detail reference. The first identifies where the seal is; the second identifies the installation detail. Quelfire’s detail references encode information such as product, substrate construction and minimum substrate thickness—not the project location.[4]

Use the following as a practical record template:

  • Location and arrangement: opening reference, drawing location, substrate construction and thickness, penetrating services and specified fire-stopping system.[2][4]
  • System evidence: product specification, applicable tested detail and reference, supporting test evidence, certification and installation instructions.[4][5]
  • Installer: the installer’s identity and details, linked to the opening’s installation record.[2]
  • Inspection links: references connecting the opening to findings, corrections and sign-off.[2]

Check the selected system against the installed substrate and service arrangement, rather than relying on a familiar product name or downloaded drawing. Quelfire expressly states that its standard details should be checked against supporting test evidence, certification and installation guidance; the drawing alone is not the complete evidence bundle.[4]

Advertisement

3. Collect evidence before, during and after installation

A satisfactory-looking finished face can leave concealed construction unverified. Quelfire says visual inspection reveals only part of an installation and recommends progressive reporting, with photographs before, during and after installation, where inspection is required.[3]

Organise the evidence around the installation sequence:

  • Before: record the opening, services and surrounding construction, linking the images to the location and proposed system detail.[2][3][4]
  • During: record construction that will become concealed, so the evidence can help distinguish full-depth installation from surface application.[3]
  • After: record the completed face and link it to the earlier images, allowing review of the installation sequence.[2][3]
Advertisement

A finished-face photograph alone may not establish the concealed annulus, seal depth or other internal construction. Coordinate evidence capture with installation and agreed inspection arrangements rather than waiting until closing-up, when these details may no longer be visible.[3]

Photographs and product certificates support acceptance; they do not certify the complete installation. Review them alongside the installed arrangement and inspection findings. BSML calls for traceable records reflecting the work, while Quelfire says its details must be checked against supporting test evidence, certification and installation instructions.[2][3][4]

4. Resolve gaps before treating an opening as accepted

Identify what is missing before deciding whether an opening is ready for acceptance. Distinguish missing paperwork from uncertainty about what was installed: a missing instruction sheet calls for document retrieval; uncertain concealed seal depth calls for assessment of the installation evidence.[2][3][4]

Advertisement
  • Unclear system applicability: refer the substrate and service arrangement to the appointed technical reviewer. Quelfire’s Technical Information Collection Form allows its team to suggest a tested solution for a specific scenario; that clarification is not proof the installed seal matches it.[4][5]
  • Unclear concealed workmanship: refer the gap to the appointed inspector rather than treating a satisfactory finished face as conclusive.

The ASFP guide explains that detailed passive-fire-protection investigations can sometimes require invasive inspection beyond routine fire-risk-assessment scope; it does not prescribe opening-up in every case.[1]

As a recommended acceptance approach, keep the affected opening recorded as unresolved until the agreed reviewer has assessed the additional evidence or investigation findings, then record the decision. This keeps uncertainty visible rather than converting missing evidence into an assumed pass.[2][3]

Advertisement

5. Record defects and verify corrections

Keep each defect linked to its opening until the correction and review outcome are recorded. BSML recommends retaining findings, remedial actions and sign-off within accurate, traceable passive-fire records.[2]

Use these fields as a practical project template, not a mandated form:[2]

  • Opening reference: link to the location and installation record.
  • Finding and evidence: describe the defect and attach photographs or inspection notes.
  • Action owner and proposed correction: identify who will address it and what they propose.
  • Correction evidence: record what was done, with supporting installation records and photographs.
  • Reviewer and status: record who reviewed the correction, their decision and outstanding actions.
Advertisement

Check the proposed correction against the applicable system’s test evidence, certification and installation instructions; a tidier finished face is not sufficient evidence of the concealed work.[3][4] Where corrective work will become concealed, capture progressive evidence rather than relying on the final photograph.[3]

Retain the original finding and link it to the remedial action and review outcome.[2] Using the agreed project roles, record the installer’s statement of completion separately from verification and acceptance; completion evidence should support recorded review and sign-off, not substitute for them.[2][3]

6. Assemble a traceable handover record

Bring the linked records into an indexed handover pack. It should allow the owner to trace each opening to its as-built location, system evidence, installer details, progressive photographs, inspection findings and correction history.[2][3][4] BSML’s recommendation is for records describing what is installed, rather than simply a collection of paperwork.[2]

Advertisement

Keep these statuses separate in the handover index:

  • Technical evidence complete: the applicable detail, supporting test evidence, certification and installation instructions are linked to the installation record.[2][4]
  • Defects closed: findings are linked to remedial actions and their recorded review outcome.[2]
  • Acceptance recorded: the project’s acceptance decision is identifiable, rather than inferred from the presence of documents.[2][3]

Recommended acceptance fields are the name and role of the person accepting the work, the date, evidence reviewed and unresolved qualifications. These are practical fields supporting contract-dependent inspection arrangements and BSML’s recommendation to retain findings, remedial actions and sign-off.[2][3]

Keep the record live after handover. BSML recommends adding later disturbances, reinstatements and remedial works so the record continues to reflect the installed condition.[2]

7. Check readiness before authorising closing-up

Use this recommended checklist alongside—not instead of—the contract’s inspection requirements:[3]

  • Project arrangements: confirm the applicable inspection requirements and who has authority to record acceptance.[3]
  • Opening and system: link the location and installed arrangement to tested-system evidence, certification, installation instructions and installer records.[2][4][5]
  • Concealed details: check progressive photographs and inspection findings address what the finished face cannot demonstrate.[3]
  • Defects: link each finding to its correction and review record, keeping unresolved issues visible.[2]
  • Handover: include the acceptance decision and supporting evidence in the traceable record of what was installed and corrected.[2]

Refer unresolved items through the agreed project process rather than treating a completed checklist as sign-off.[2][3]

References

  1. ASFP Guide to Inspecting Passive Fire Protection for Fire Risk Assessors (glosfire.gov.uk)
  2. The Golden Thread in Practice Getting Your Passive Fire Documentation Right (bsmlfire.co.uk)
  3. Do Quelfire offer inspections of their products installed? (quelfire.co.uk, 2025)
  4. Standard Firestopping Installation Detail Drawings – Quelfire (quelfire.co.uk)
  5. Technical Support & Resources – Quelfire (quelfire.co.uk)
Advertisement

Similar reads