Commercial air curtains: requirements for US facilities teams
Choose a commercial air curtain by matching documented discharge coverage and mounting-height performance to the measured doorway, then specifying its electrical supply and door-control sequence. Berner identifies these as selection and installation criteria.[1][2]

- Required for the selection: Document opening dimensions, proposed mounting height, model-specific performance, structural support, clearances and electrical requirements.[1][2]
- Required when applicable: Include the agreed door interlock, heated-unit controls and evidence supporting any claimed vestibule exception.[1][2]
- Optional unless specified: Select variable-speed operation and building management system (BMS) integration according to the operating sequence.[1]
Measure the clear opening and discharge location
Select against the measured opening and proposed discharge position—not the cabinet’s advertised length. Berner says discharge width should match the opening width for maximum effectiveness.[2]
Use this site worksheet:
- Clear opening: Measure unobstructed doorway width and height; keep these separate from nominal door dimensions.[1][2]
- Discharge location: Record proposed nozzle elevation above the finished floor and its position relative to the opening. Do not assume door height equals mounting height.[1][2]
- Installation space: Note overhead space, obstructions and mounting substrate; check clearances and structural connections against the model’s installation drawing.[1][2]
- Application: Record the entrance’s purpose and door type, which Berner includes among specification criteria.[1]
Keep clear opening width, cabinet width and discharge width in separate fields. Berner’s coverage guidance concerns discharge width, not cabinet length.[2]
Resolve support before screening models: Berner directs installers to anchor to framing or a header, not drywall alone, and position the nozzle as close as possible to directly above the opening. Use model-specific clearance and mounting-height documentation rather than a universal limit.[1][2]
Require model-specific evidence before accepting a fit
Request the exact model’s documented discharge width and maximum mounting height for the intended application. Compare those figures with your clear opening and nozzle elevation. [1][2]
For each item below, record site requirement, proposed model documentation and acceptance status. Mark the result “supported,” “mismatch” or “unresolved”; missing evidence is not proof of failure.
- Discharge coverage: Compare measured clear opening width with documented discharge width.[2]
- Mounting-height performance: Compare the proposed discharge height and application with model-specific performance data.[1][2]
- Orientation: Confirm documentation supports the planned horizontal or vertical arrangement.[1][2]
- Clearances: Compare available space with the model’s installation drawing.[1]
- Structural connections: Check the support arrangement against documented unit weight and connection points.[1]
- Electrical supply: Compare site voltage and phase with the electrical sheet and nameplate requirements, including amperage.[1][2]
- Controls: Match the operating sequence and integration requirements to wiring diagrams and control-point documentation.[1][2]
Request the model submittal, performance data, installation drawing, electrical sheet and wiring diagram, plus point lists where integration is included. Berner makes these document categories available and offers project-specific sizing and submittal review at no charge.[1]
Berner describes AMCA-certified ratings as independently verified performance data. Keep that evidence separate from claims of energy savings, pest exclusion or project code compliance.[1]
Reject an undersized proposal: a hypothetical example
Hypothetical example: A proposal documents a discharge width narrower than the measured clear opening. Even if the cabinet appears wide enough, the documented discharge leaves part of the doorway uncovered. Reject the proposal against the full-width coverage criterion.[2]
Mounting height remains a separate check. A revised proposal with full-width discharge still needs performance documentation for the actual proposed height and application.[1][2]
Request a revised selection documenting both full opening coverage and mounting-height performance, with compatible mounting, electrical and control details—not simply a wider cabinet.[1][2]
Specify door-interlock behavior and optional controls
For door-triggered operation, put the sequence in the quote: opening the door activates the air curtain; closing it deactivates the unit. Berner describes a dry-contact door-switch/interlock arrangement at 24V or 120V. Use the selected model’s wiring diagram to establish the interface rather than treating these descriptions as interchangeable wiring instructions.[1][2]
Separate the control scope into three categories:
- Required by the agreed sequence: Include the door contact, compatible interface and interlock testing. Assign who supplies the contact, who wires it and who demonstrates the open/close sequence during commissioning.[2]
- Required by a claimed compliance path: Berner says vestibule-exception installations must energize the unit whenever the door is open. It also identifies thermostat/temperature control with an adjustable discharge-temperature setpoint for heated units using the ASHRAE 90.1 vestibule-exception path.[1]
- Optional unless the project requires them: Berner lists manual on/off and low/high-speed options, plus variable-speed operation described as adjusting to door activity or occupancy. Its BACnet/IP, BACnet MS/TP and Modbus RTU options support functions including status monitoring, speed control and fault alerts.[1]
Specify the desired BMS functions rather than accepting only “BMS ready.” Include the relevant point lists and wiring documentation in the submittal.[1]
Resolve electrical and mounting requirements in the quote
Identify the exact model, nameplate voltage, phase and amperage, accessories and wiring diagram. Assign responsibility for conduit, wiring, fasteners and structural supports; these reflect Berner’s pre-installation checks.[2]
Keep supply voltage separate from switch-input ratings. Berner’s specification page lists 120V, 208V, 240V and 277V single-phase supplies; its installation page separately describes a 120–480V line-voltage on/off-switch input range. Require the model’s electrical sheet and wiring diagram to resolve compatibility with the site supply.[1][2]
Have a licensed electrician use the unit-specific wiring diagram and verify the supply, disconnect and wiring requirements under the locally adopted rules. For a heated model, include the applicable disconnect arrangement in the installer’s scope. [2]
Use the installation drawing for unit weight, connection points and clearances. Include necessary support work explicitly rather than leaving a generic mounting allowance.[1][2]
Separate fit checks from conditional compliance requirements
Document the intended application before assigning certification requirements. Berner distinguishes ordinary doorway selection, vestibule exceptions, and sanitary or flying-insect-control applications.[1]
- Vestibule alternative: confirm the adopted code edition with the project team. As an example, the 2021 IECC model code specifies at least 6.56 ft/s at the floor, testing to ANSI/AMCA 220, installation per the maker’s instructions and controls that operate with the door.
- Vestibule-exception operation: document the selected control sequence and have the authority having jurisdiction confirm that the proposed installation meets the applicable provisions. [1]
- Flying-insect control: Berner identifies ANSI/NSF Standard 37 certification for food-service and sanitary applications. Tie the certification request to the intended function.[1]
Treat these as manufacturer guidance to resolve for the project, not as an AHJ decision or independent confirmation of code compliance.[1][2]
Make commissioning results part of acceptance
Include recorded commissioning in the installation scope, not simply delivery and power-up. Berner’s installation guidance covers these checks:[2]
- Startup and airflow: Restore power, confirm fan rotation and unobstructed discharge, and adjust airflow.[2]
- Mechanical checks: Check fasteners and vibration.[2]
- Door interlock: Where specified, operate the door and verify the agreed activation and deactivation sequence.[1][2]
- Selected features: Verify heat operation, variable-speed response, and BACnet discovery and status read-back where those features are included.[2]
Keep functional checks separate from supporting performance documentation. If acceptance depends on a claimed performance criterion, identify the criterion, model-specific evidence and responsibility for verification in the quote.[1][2]
Require a handover file with the model, serial number, installation date and commissioning results. Berner provides a commissioning record sheet and says to retain the completed copy with maintenance records.[2] Keep missing fit documentation and failed agreed tests on the open-item list before completion sign-off.
Confirm maintenance access before closing the specification
Have the proposed layout show how technicians will reach components for cleaning, inspection and replacement. Check model-specific drawings rather than assuming a standard clearance: Berner says clearances vary by model and application.[1][2]
Build Berner’s maintenance schedule into the handover plan:
- Monthly: Visual inspection.[2]
- Quarterly: Clean the inlet grille and discharge nozzle, check the inlet and filters, and tighten hardware.[2]
- Annually: Check blowers, interlocks, controls, heating elements where fitted, and electrical connections.[2]
- As needed: Filter, thermal-limit, bearing or fan-blade work.[2]
Retain the model and serial number for replacement-parts orders. Berner lists limited warranty coverage of 5 years for unheated models, 2 years for heated models and Air Entrance Systems, and 1 year for Drive-Thru units; proof of scheduled maintenance may be required for warranty claims.[2]
Before accepting the quote, confirm full-width discharge, performance at the intended mounting height, electrical details, maintenance access and responsibility for commissioning. Ask for energy-code and sanitation documentation separately wherever the project requires them. [1][2]