How to choose partial discharge testing: Australian asset owners
Choose partial discharge testing by defining the decision the survey must support, then agree suitable methods, access, outage arrangements and report evidence before booking. Online screening and controlled offline assessment answer different questions; detecting a signal is not, by itself, a diagnosis of severity or failure timing.[2][3][4]

Start with the asset and the question
State whether you need population screening, investigation of a particular indication, a repeatable baseline or confirmation after remedial work. As technical background—not an Australian service option—Shanghai-based equipment supplier HV Testers recommends defining the asset, likely defect, available access, outage position and required evidence level before choosing a method.[4]
Make the assessment’s purpose the opening line of your enquiry, then include:
- Asset identity: site or substation, asset identifiers, voltage, air-insulated (AIS) or gas-insulated (GIS) construction where known, and the panels, compartments and cable terminations in scope.
- The concern: describe the observation separately from the suspected diagnosis. Possible issues include surface tracking, moisture ingress, internal insulation defects or degraded joints and terminations.[2][4]
- Existing evidence: previous readings and reports, plus available loading, operating and environmental-condition records.
- Access and timing: known sensor provisions, access constraints, outage availability, preferred dates and the quote deadline.
Megavar deploys from offices in Tasmania, SA, NSW and Queensland to sites across all Australian states and territories.[2]
Mark details as confirmed, suspected or unknown. Attach existing drawings, photographs and maintenance records where available; do not obtain new access to energised equipment to complete the enquiry.
A concise brief could read:
“Assess these assets for this purpose, investigate this concern, work within these access and outage constraints, and provide evidence sufficient to decide between continued monitoring and further investigation.”
Choose online screening, offline assessment or a staged scope
Choose the scope by the question it must answer: screening and trending under operating conditions, or controlled confirmation and more detailed characterisation. Online assessment observes energised equipment; offline assessment requires isolation and an external test voltage.[1][2][4]
Megavar describes online detection and location using transient earth voltage (TEV), high-frequency current transformer (HFCT) and ultra-high-frequency (UHF) sensors. Megavar’s offline service includes calibrated measurement and phase-resolved partial discharge (PRPD) pattern analysis for defect classification using the Omicron MPD 600 partial discharge system.[2] Operating load, interference and sensor placement can influence online results, so the approaches are not interchangeable.[4]
Construction and existing access also shape the choice. HV Testers’ background guidance links methods to these conditions:
- TEV: suitable enclosed, metal-clad switchgear panels.[4]
- UHF: GIS compartments with available couplers.[4]
- HFCT: suitable, accessible cable earth paths.[4]
- Ultrasound: relevant surface activity or source location.[4]
A staged scope can screen the asset population, check suspect activity with an independent sensor family, then proceed to controlled assessment or location work where justified and feasible. HV Testers describes this sequence; it does not establish that every sensor suits every switchgear design.[4]
Ask the specialist to explain what the proposed scope cannot establish, including access limitations and whether further assessment may be needed. Request asset-specific sensitivity and duration expectations rather than assuming a universal accuracy ranking.
Check that the proposal matches the switchgear
Ask the specialist to connect its published capabilities to the particular switchgear—not simply attach a service brochure. Megavar advertises Australia-wide assessment of AIS and GIS switchgear, online TEV, HFCT and UHF sensing, and controlled offline testing with calibrated measurement and PRPD analysis.[2]
Request an asset-by-asset scope showing:
- The question: what the assessment is intended to resolve for each asset group.
- The method and access: which technique is proposed, where suitable sensor access exists and what preparation is needed.
- The evidence and limits: what the method will produce and which conclusions it cannot support.
Megavar says its work follows IEC 60270, IEC 62478, CIGRE TB 728/861 and IEEE 400.[2] Ask which provisions apply to the asset and test arrangement, and how the proposed work will address them; a standards list is not a complete scope.
Megavar also reports electrical-contractor licences in every Australian state and ISO 9001, ISO 14001 and ISO 45001 certifications.[2] Confirm the proposed personnel’s relevant experience, credentials and insurance directly. Ask who will interpret and sign off the findings rather than treating provider-reported certification alone as assurance of diagnostic quality.
Specify report evidence before accepting the quote
Attach a report acceptance checklist to the enquiry so the specialist can price the evidence required. Treat it as a requested deliverable, not a mandated Australian format, and agree which items the scope will provide.
- Coverage and test state: request an asset-by-asset record identifying what was assessed, whether it was energised or tested offline, the method, sensor type and position, exclusions, and inaccessible or untested assets. Include instrument settings and operating and measurement conditions.[2][3][4]
- Units and evidence type: require clear separation of calibrated apparent charge in picocoulombs (pC), relative screening amplitudes and location estimates. Picocoulombs and millivolts (mV) are not directly interchangeable: their meaning depends on the method, sensor, settings and test configuration.[3][4]
- Signal verification: ask for background/interference assessment and an explanation of how suspected discharge was distinguished from noise—for example, through background and phase comparisons, gating or independent sensor checks. Request relevant phase-resolved evidence, confidence and limitations; pattern shapes can have more than one explanation.[4]
- Repeat-survey records: specify records sufficient to reproduce sensor positions, settings and conditions, with comparisons against the asset’s baseline or earlier equivalent measurements. Otherwise, an apparent change may not represent a meaningful trend.[3]
- Findings and interpretation: request a summary separating measured results from interpretation, linking evidence to recommended action and identifying unresolved questions. Include magnitude, repetition rate and phase position where applicable; inception voltage is relevant where test voltage can be controlled and varied.[3][4]
Rugged Monitoring’s interpretation guidance supports these reporting distinctions. It offers sensors rather than an Australian assessment service, and cautions against interpreting magnitude alone: context, trends and other condition evidence matter.[3]
Agree access, outage responsibilities and written pricing
Before accepting the quote, turn the proposed scope into a written site-readiness and responsibility checklist:
- Asset availability and access: identify the assets available for assessment, site-entry arrangements, existing sensor access and restrictions.
- Outage arrangements: record the available window, site contacts and who coordinates the specialist with authorised personnel.
- Responsibilities: allocate isolation, access, confirmation of the asset’s test state and return-to-service responsibilities, without treating the booking document as an operational procedure.
Megavar’s cited page does not state a monetary price or minimum term; urgent fault and outage enquiries are directed to a discussion about the site, access window and mobilisation.[2]
Ask for an itemised quote separating the agreed survey from optional confirmation testing, extended monitoring, repeat visits and follow-up reporting. Request written treatment of:
- Mobilisation and travel charges, including additional attendance.
- Outage delays, inaccessible assets and changes to scope.
- Cancellation or rescheduling, payment terms, and warranty, remedy or refund provisions.
Agree attendance dates, report turnaround and follow-up support included in the price. Megavar states an engineer will respond by the end of the next business day during office hours; that is an enquiry-response commitment, not a promised attendance or report-delivery time.[2]
Evaluate findings against conditions, confidence and history
Read the findings as an evidence chain, not just a severity colour. Rugged Monitoring’s guidance considers magnitude, repetition, phase relationship, history and other condition information together—not a single reading.[3]
- Match the report to the agreed scope. Check asset identifiers, equipment operating states, explicit exclusions and untested assets. Ask for clarification of unexplained blanks rather than reading them as an “all clear”.[2][4]
- Identify the measurement. Check what each value represents and whether comparisons use equivalent methods and configurations. A relative screening amplitude should not be presented as calibrated apparent charge.[3][4]
- Check interference evidence. Look for background readings and evidence separating local activity from noise, such as cross-phase or multi-sensor comparisons. Interference can imitate PD.[4]
- Inspect the baseline. Check that sensor positions, settings and operating and measurement conditions support a meaningful comparison with earlier results.[3]
- Review interpretation and confidence. Ask whether magnitude, repetition and phase relationship support the conclusion together, whether other condition information was considered, and whether uncertainty is explained.[3][4]
There is no universal acceptable PD level: significance depends on the asset, method and context; neither detection nor a high reading establishes failure timing.[3]
Ask for clarification where conclusions outrun the evidence, units are unexplained, comparisons are incompatible or untested assets remain ambiguous.
Close with an agreed follow-up plan
Turn each accepted finding into an action with an owner. Use these conditional pathways to frame the discussion:
- Stable activity under comparable conditions: retain the baseline and discuss continued monitoring.[3]
- A sustained rising trend: investigate the change and consider closer observation.[3]
- New or sudden activity: arrange prompt verification and appropriate diagnostics before drawing conclusions about significance.[3]
Ask the specialist to explain the basis and urgency of each recommendation for the particular asset—not simply assign a generic retest interval or automatic replacement instruction. Interpretation depends on the insulation system, method, operating context and history.[3]
For each finding, record the evidence, confidence, proposed action, responsible party, timing and access or outage dependencies. Agree this action register as a deliverable. Clarify whether independent confirmation, controlled offline assessment, monitoring and post-remedial retesting are included or require a separate quote.
References
- Partial Discharge Testing | LIVE HV (livehv.com.au, 2024)
- Partial Discharge Testing | Online and Offline PD | Megavar (megavar.com.au)
- Partial Discharge Analysis: How to Interpret PD Results (ruggedmonitoring.com)
- How Should Partial Discharge Testing Methods Be Selected? (hvtesters.com, 2026)