BS 5837 Tree Survey: Requirements for England’s Architects
Before fixing the layout, commission a linked tree schedule and scaled tree constraints plan (TCP) showing tree positions, canopies and Root Protection Areas on a base your architect can overlay.[2] Keep this pre-design handover separate from the planning submission: the TCP is an early design tool, not the complete submission package.[2][5]

1. Separate planning requirements from the design brief
Start with the local planning authority’s validation list. Tower Hamlets cites BS 5837:2012, Trees in relation to design, demolition and construction, for the example below. [1] Confirm the submission documents and edition your own authority asks you to use for the site.
Tower Hamlets’ requirement applies where works affect protected trees on or off the site—through Tree Preservation Orders or conservation-area legislation—or other sizeable trees without those protections.[1] Use the council’s interactive map to check designations. Its stated trigger is the effect on trees, not a universal distance from the proposed building.[1]
- Required accompanying report: Tower Hamlets specifies a report following BS 5837:2012. Include a tree survey, the council’s “arboricultural implications assessment”, a concise list of trees to retain or remove, details of any other proposed work on trees and a method statement explaining physical protection during construction. [1]
- Required planting drawing: show new tree planting, whether intended to mitigate tree losses or form part of new landscaping.[1]
- Encouraged discussion: speaking with an Arboriculture Officer before submission is encouraged, rather than a mandatory pre-submission approval stage.[1]
- Recommended commissioning checks: agree CAD coordination alongside a review PDF, and reconcile schedule references with the site base. These are handover recommendations, not additional Tower Hamlets validation rules.[1][2]
2. Specify a usable tree schedule
Ask for enough detail to interpret each plotted tree, not simply a species list. Devon Tree Services’ data-collection guidance provides this commissioning checklist:[4]
- Identification: a reference for each tree, group or woodland, linked to the drawing. References are usually also linked to physical stem tags; do not assume every surveyed item will have a tag.[4]
- Species and dimensions: species, overall height, stem diameter and crown spread measured in four directions.[4]
- Branch and canopy clearance: the first significant branch and canopy-base height, with relevant directional information.[4]
- Life stage and condition: Record the tree’s life stage, structural and physiological condition, defects and signs of decay, pests or declining vigour. Include observations about any urgent work. [4]
- Contribution and grading: estimated remaining contribution and the BS5837 category and subcategory—not simply an unexplained colour on the drawing.[4]
Do not define the survey scope solely by the ownership boundary. PlanWatch’s guidance includes neighbouring trees where their canopies or Root Protection Areas (RPAs) influence the site; ask for those trees to be covered too.[5]
3. Reconcile tree references with the topographical base
Check that the schedule and constraints drawing describe the same trees in the same places. Arbor Cultural and Devon Tree Services describe a linked chain: field references connect to schedule entries and matching references plotted on the topographical base.[2][4]
- Identify the agreed base. Record the topographical drawing identifier and revision used for the overlay. Arbor Cultural warns that accurate tree information on a poor or outdated base can still leave design uncertainty.[2]
- Work from schedule to plan. Tick off each tree, group or woodland reference against its plotted counterpart, flagging missing or duplicated labels. The reference-to-plan link is described by both guidance pages.[2][4]
- Check in reverse. Work through the plotted references and find their schedule entries.
- Inspect the positions. Compare tree locations with boundaries, buildings, levels, services and other fixed context shown on the base.[2][4]
Keep a discrepancy list recording the reference, whether its schedule and plan entries are present, any position query and who will resolve it.
Example: T07 appears in the schedule but is missing from the overlay—or appears on the opposite side of an existing boundary. Mark the discrepancy and ask the consultant to resolve it, rather than moving the symbol to accommodate the proposed footprint.
Return an annotated drawing identifying the base revision, and record the consultant’s resolutions before relying on the overlay for design. Use this visual check to raise queries, not as a substitute for a measured survey.
4. Agree CAD overlays and a matching review PDF
Agree both a CAD overlay and a matching review PDF at instruction. PDF supports review and circulation; CAD supports coordination with the architect’s drawings. Do not assume both are included in the quoted scope.[2][3]
Specify the core overlay: surveyed tree positions and references, current crown spreads, RPAs and BS5837 categories, plotted on a scaled topographical or measured base.[2][3][4] Include relevant off-site trees where their crowns or RPAs influence the site.[5]
Use these commissioning checks when agreeing the digital handover:
- File compatibility: ask the architect to specify the CAD format and version their software can use.
- Units and alignment: agree how the tree drawing will align with the architect’s site base.
- Identifiable layers: request distinguishable tree-position, canopy and RPA information, with references retained.
- Issue control: identify the base drawing revision and request a PDF representing the same issued information as the CAD file.
These checks put Arbor Cultural’s emphasis on coordinated CAD information and agreed outputs into practice.[2] Ask the architect to test the overlay in their software and compare it with the PDF before accepting the handover.
Where useful, scope branch-clearance information, shading, future growth, levels and services as additional design information—not as separate Tower Hamlets validation requirements.[1][2][4][5] BIM, 3D or 4D outputs need an expressly agreed scope; ordinary CAD delivery should not be taken to include them.[2]
5. Test the whole scheme, not only the footprint
A building outline clear of tree constraints does not settle the rest of the scheme. Review both the above-ground canopy and the RPA against the coordinated design.[2][4]
Ask the architect to mark potential conflicts involving:
- Roads and access: compare proposed routes with canopy spreads and RPAs.[2]
- Drainage and utilities: overlay their routes, including connections beyond the building.[2]
- Foundations, scaffolding and construction working space: check their extent, not only the finished walls.[2]
- Levels, retaining features and branch clearance: use spot levels, tree-base levels, canopy-base and first-branch information where relevant.[2][4]
Example: the building sits outside the plotted RPAs, but its drainage route crosses one. Mark the crossing as a question for the arboriculturist, rather than treating the footprint check as complete.
Before settling the layout, send unresolved conflicts to the arboriculturist as marked-up questions on the coordinated drawing. The review needs to cover access, services and working space as well as the building.[2]
6. Define the scope after a layout change
Send a revision pack, not simply the changed building outline. Include the latest layout and topographical base, existing tree survey and constraints information, relevant planning wording and the project deadline.[2][3]
Add a short change log and marked-up drawing identifying changes to the footprint, access, drainage, utilities, foundations, levels and construction working space. This makes the potential conflicts explicit rather than leaving the consultant to infer what changed.[2][4]
Ask for a written scope covering the applicable outputs:
- Source data: identify whether existing information needs correcting or a fresh tree survey is needed.[2]
- Revised TCP: agree which constraints drawing will be updated for the architect’s next layout test.[2][3]
- Arboricultural Impact Assessment: assess the proposed scheme’s effects on trees and the mitigation needed.[2][5]
- Tree Protection Plan: show physical protection arrangements, including barriers, exclusion zones and ground protection.[2][4][5]
- Arboricultural Method Statement: explain how sensitive construction operations will be carried out.[2][4][5]
- Digital coordination: specify revised CAD and matching PDF deliverables, with advanced outputs separately scoped.[2]
For Tower Hamlets’ submission package, retain the council’s wording: “arboricultural implications assessment”. Commissioning a revised TCP should not be treated as commissioning that assessment or the required protection method statement.[1][2]
Agree in writing which layout changes will require further review, which revised outputs will be supplied and whether any revisions are included in the fee. Use the revision pack and change log to confirm the scope and price with the consultant. Arbtech offers a free quote based on the dimensions and circumstances of the development site and planning project.[3]
7. Check the handover before fixing the layout
Use this as a project-coordination checklist. Record who checked the handover and which drawing revisions they reviewed.
- Tree schedule contains the agreed identification, dimensions, condition and grading information.[4]
- Schedule and plan references have been reconciled in both directions.[2][4]
- The topographical base revision is identified, with boundaries, buildings and levels checked for consistency.[2]
- The architect has tested the CAD overlay and received a matching review PDF.[2][3]
- Unresolved design conflicts are logged for arboricultural review.[2]
- The authority’s submission documents are separately accounted for; in Tower Hamlets, this includes the required report and planting drawing.[1]
- Responsibility and scope are agreed for the next assessment, protection documents or drawing revision.[2]
References
- Tree survey / Arboricultural Statement (towerhamlets.gov.uk)
- Tree Constraints Plan (TCP) | BS5837 – Arbor Cultural (google.com, 2026)
- Tree Constraints Plan (TCP): Detail the Impact on Trees (google.com)
- Phase 1: Tree Constraints Plan and Data Collection (google.com, 2026)
- What Is a Tree Constraints Plan (TCP)? A Plain-English Guide … (google.com)