How to choose dynamic cone penetration testing: Australian project managers

Advertisement

Choose a dynamic cone penetration testing provider by getting the engineer’s required locations, depth records, termination notes and interpretation itemised in the quote—not by accepting an undefined promise of “testing and results”. Site Geotechnical’s and Probe Geotechnical’s cited pages do not establish that every quote includes a defined interpreted report package.[2][4]

Individual participating in an outdoor training exercise, crawling under ropes.
Advertisement

Start with the engineer’s decision

Before seeking prices, ask your project engineer to separate the essential deliverables from work needed only under agreed conditions:

  • Required for the decision: identify the design or construction question, nominated test points, requested depths and reporting requirements.
  • Required output: confirm whether field records are sufficient or an interpreted geotechnical report is needed.
  • Conditional work: identify when drilling, sampling, laboratory testing or additional points would need approval.

ESWNMAN’s Georges Hall investigation in NSW included approximate test locations, separate DCP records and borehole logs, alongside interpretation addressing foundations, excavation, retaining structures, subgrade preparation and earthworks.[1] The records documented the investigation; the interpretation connected the findings to the project’s design and construction questions.[1]

Have the provider identify those inclusions against the engineer’s brief. Agree whether you are commissioning field records, an interpreted report or both before accepting the quote.

Advertisement

Specify locations, depth readings and termination records

Ask for a deliverable schedule linking every nominated test ID to its planned requirements and actual field record. For each test, request:

  • Requested location and depth: the engineer’s nominated point and target depth.
  • Actual location: where testing occurred, linked to the same test ID on the location plan.
  • Depth-indexed readings: recorded blow counts and penetration depths, with units and recording increments identified.
  • Actual termination: depth reached and observed reason for stopping, with engineering interpretation recorded separately.

Have the engineer confirm the recording requirements before booking. Probe Geotechnical, which advertises services from Melbourne and Brisbane, describes blow counts recorded against penetration depth, usually every 10 mm or per blow depending on penetration rate.[4] Ask for the proposed log format rather than assuming this description defines the delivered record.

Advertisement

Keep requested depth, actual termination depth and refusal depth separate. Ask the provider to identify whether each test stopped at the requested depth, at refusal or for another recorded reason.

The Georges Hall investigation’s four DCP refusal depths were approximately 1.7 m, 1.6 m, 1.1 m and 1.5 m below ground level—not a single site-wide depth. The report interpreted those refusals as inferred rock.[1] Preserve that distinction between observation and interpretation.

The report placed approximate locations in Appendix A, borehole logs and explanatory notes in Appendix C, and DCP records in Appendix D.[1] Ask whether approximate locations satisfy your engineer or whether a specified coordinate or level reference is needed. Do not assume surveyed coordinates are included.

Advertisement

Agree what happens when access prevents testing

Give the provider the nominated-point plan and known restrictions before booking. Agree who will confirm access and arrange permissions or preparation.

At Georges Hall, existing structures and concrete restricted drilling to limited areas. The front-yard garden borehole reached refusal at approximately 1.4 m below ground level—a borehole result, separate from the DCP refusal depths.[1] The investigation included service-plan collection and review, plus a walkover to assess access, surface conditions and test locations.[1] Request these activities explicitly if needed.

Set a written change process for inaccessible points and tests stopping short of the requested depth:

Advertisement
  • Approval: nominate who the field team contacts, who authorises moved, omitted or additional points, and when the engineer must approve changes.
  • Pricing: agree how changed work will be priced and approved before proceeding.
  • Records: request as-tested locations, reasons for departures, actual termination depths and resulting investigation limitations.
  • Attendance: ask how mobilisation, unsuccessful attempts and return visits would be charged, including when access is unavailable on arrival.

If the nominated contact cannot be reached, should the team pause, omit the point or undertake an agreed alternative? Put that instruction in the accepted scope.

Check what the starting price and turnaround cover

Probe Geotechnical advertises DCP testing from A$350 and says results are typically available the same day. Confirm whether that means on-site readings, a results sheet or a final interpreted report with all the requested attachments. [4]

Advertisement

Use the following headings for the itemised quote.

  • Field attendance and testing: mobilisation, included quantities and additional-test charges.
  • Records: location documentation and individual depth-indexed raw logs.
  • Engineering deliverables: interpretation, final report preparation and requested attachments.

Put separate delivery dates in the quotation for the raw records and the engineer’s final report, with the attachments due at each stage.

Have travel, early termination, variations, cancellation, refunds and return visits addressed in writing. Identify fixed and conditional charges, and require approval before extra costs are incurred.

Ask whether DCP alone answers the question

Check whether the proposed investigation can provide the depth and material evidence the engineer needs. Probe describes DCP as shallow—typically reaching a few metres in favourable ground, with less penetration in dense gravel or where refusal occurs early. It also states that DCP does not recover a physical soil sample for laboratory classification.[4]

Advertisement

For deeper foundation investigations or work requiring samples for tests such as Atterberg limits or shrink-swell testing, Probe describes pairing DCP with drilling and Standard Penetration Testing rather than relying on DCP alone.[4]

Site Geotechnical, whose service page carries a Tyabb, Victoria address, describes material-property testing alongside field-strength testing to help distinguish material types, assess moisture changes with depth, identify layer boundaries and flag abnormal readings.[2]

Ask the engineer whether drilling, sampling or laboratory testing should be included from the outset or allowed for as an authorised contingency. Record what would trigger the additional work and who approves it.

Advertisement

Verify the testing scope and interpretation responsibility

Ask who will perform the testing, review the logs and author or sign the engineering interpretation. Australian Geotechnical Testing – Adelaide lists Mr Loky Maynard as its contact; request relevant qualifications, experience and insurance details rather than accepting “testing and report” as a complete service description. [3]

For an accreditation-check example, Australian Geotechnical Testing – Adelaide, in Evanston South, South Australia, has a NATA-listed ISO/IEC 17025 (2017) scope including soil in-situ dynamic-cone penetration under AS 1289.6.3.2.[3] That scope establishes the accredited testing activities; it does not establish a quotation package, an interpretation service or the qualifications of a named report author.[3]

Keep the checks separate: have the responsible engineer confirm the applicable method and project-specific recording requirements, obtain the provider’s agreement, and identify who takes responsibility for the engineering conclusions.

Advertisement

Put the deliverables into the quote

Send a scope request with the engineer’s brief and ask the provider to mark acceptance, exclusions or proposed changes against each item:

Please itemise your quote against these requirements:

  • Purpose and scope: Record the engineering decision, nominated plan and revision, test IDs and quantity, requested depth at each point, and method confirmed by our engineer.
  • Field records: Include actual test locations on a marked plan, individual depth-indexed readings, achieved termination depths, refusal observations, departures from the brief and documented limitations. Distinguish requested depths from depths achieved.
  • Interpreted report: Specify the interpretation, recommendations and attachments to be included alongside raw records. Identify exclusions, including drilling, sampling or laboratory testing.
  • Access and variations: Nominate the approval contact. Agree the approval process before mobilisation. Notify the contact if access prevents testing or a point terminates early. Obtain approval before relocating points, adding work or arranging another visit; document reasons, costs and timing implications.
  • Charges and delivery: Itemise testing, reporting, mobilisation and additional-work charges. State preliminary-results and final-report timing, the responsible report author, and booking, cancellation and refund terms.

Please return your acceptance, qualifications and exclusions with the quote.

Check the delivered package before closing out

Check the package against the accepted scope, then refer technical acceptance to the project engineer:

  • Account for each nominated point. Identify tested, moved or omitted points and explain departures. Georges Hall documented access restrictions alongside approximate test locations.[1]
  • Match identifiers. Check point IDs across the plan, logs, termination records and interpretation. The Georges Hall report links mapped locations with individual DCP records and its assessment.[1]
  • Compare requested and achieved depths. Look for each point’s actual termination depth. Ask the engineer whether early termination or another documented limitation affects the intended decision.
  • Separate observation from interpretation. Georges Hall records refusal depths and interprets them as inferred top of rock.[1] Check that the delivered wording preserves the distinction.
  • Check the engineering answer. Does the interpretation address the commissioned decision and identify whether further investigation is needed? Georges Hall included assessment of foundations, excavation and earthworks, not merely readings.[1]

Request missing records or interpretation against the agreed scope. Leave derivation and acceptance of design values to the responsible engineer, and close out only after the required deliverables have been checked.

References

  1. GEOTECHNICAL INVESTIGATION REPORT (nsw.gov.au)
  2. Dynamic Cone Penetrometer Testing | SITE Geo (sitegeo.com.au)
  3. Australian Geotechnical Testing – Adelaide – Accredited Organisation (Site No. 21613) – NATA (nata.com.au, 2013)
  4. What Is a DCP Test? Dynamic Cone Penetration Explained | Probegeo (probegeo.com.au, 2026)