Start with the building strategy, not a generic checklist

Specify smoke ventilation maintenance from the building’s fire strategy and cause-and-effect requirements, with a test and recorded result for each zone—not as a generic visual service.[1][5]

Close-up of a modern metallic ventilation system in an industrial setting.
Advertisement

London Fire Brigade says the ventilation strategy’s purpose and function should be understood and reflected in the Fire Risk Assessment and emergency plan or fire strategy.[1] Its guidance applies to Group A landlords managing London properties, so confirm the requirements for the building’s jurisdiction.[1]

Obtain the asset register, system design, fire strategy, cause-and-effect strategy, maintenance logs and an up-to-date Fire Risk Assessment before defining the service.[4] BSI identifies BS 9999:2017 as its current release and BS 7346-8:2013 as current for the planning, design, installation, commissioning and maintenance of smoke-control systems.[6][7] Do not reproduce conflicting edition or annex references from supplier blogs as a maintenance specification. Require a competent specialist to identify the relevant clauses, manufacturer instructions and adopted design basis for this building, then explain the test programme and any departures. A catalogue’s current status does not by itself determine every duty or interval for an existing installation.

Advertisement

Turn the strategy into a zone-by-zone test schedule

Convert the cause-and-effect matrix into a schedule line for every smoke-control zone, using the same scope for the quotation, attendance record and results.[5]

  • Zone and trigger: record the zone identifier, initiating detector or other planned initiation method, and the input to the control system.
  • Commanded response: list the activated components, activation sequence and expected final state.
  • Unaffected areas: state what equipment in other zones should do—or should not do—during the test.
  • Evidence: record the observed response and any discrepancy. A cause-and-effect schedule should identify the initiating detector, activated components, sequence and required state of components in other zones.[5]
Advertisement

Link each scheduled component to a unique asset identifier showing its block, floor and zone, manufacturer, model, installation date and essential characteristics.[5]

London Fire Brigade describes one arrangement in which vents open on the floor of first detection and at the smoke-shaft head, while vents on other floors remain closed.[1] Use the building’s strategy rather than assuming this sequence applies universally.

The quotation should state whether every zone will be tested during the visit or through an agreed rotating programme. Group SCS says rotating weekly inspections can satisfy its three-monthly approach if every zone is tested separately within that period.[2]

Define the asset and interface boundaries

Set each test boundary from the initiating device, through the control panel and connected interfaces, to the final response. Record the commanded and actual state of each relevant component.[5]

Advertisement

The asset survey should identify:

  • control panels, firefighter override switches and their controlled zones;
  • fire-detection interfaces, AOVs, roof vents, louvres, dampers and fans;
  • primary and secondary power supplies and automatic transfer switches; and
  • shafts, ductwork, cable routes, compartment-boundary fire dampers and cleaning access panels.[5]

Where part of the installed design, include tests of primary-to-secondary supply changeover, duty-equipment failure, standby operation and simulated fault monitoring—not merely visible vent operation.[3] Resolve whether assets belong to smoke control, general ventilation or another fire-safety function against the system design and equipment documentation.[4][5]

A maintenance visit does not establish the condition of every related fire-safety measure. For the residential properties covered by London Fire Brigade’s guidance, the ventilation system also depends on flat entrance doors remaining in good working order, with suitable fire resistance and functioning self-closing devices.[1]

Advertisement

Handle missing records without inventing design intent

Missing records should trigger investigation, not an assumption that present behaviour represents the intended design. Commission a competent survey of the smoke-control components, recording what can be established from the installed equipment and which performance criteria remain unknown.[5]

Use three evidence labels:

  • Verified design requirement: supported by the fire strategy, drawing, cause-and-effect schedule or another building record.
  • Observed installed behaviour: what occurred during inspection or testing, without treating it as proof of design intent.
  • Unresolved requirement: a criterion that cannot yet be confirmed.

If no cause-and-effect schedule exists, test each zone and document its actual response. Flag differences between expected and observed operation for investigation rather than adopting the observed response as the design.[5]

BS 7346-8:2013 covers smoke-control equipment together with its controls, power supplies and interconnections.[7] At a maintenance-provider change, ask the incoming specialist to document a baseline inspection, missing records and unresolved performance criteria. Require the tenderer to identify the applicable clauses and the person competent to accept any reconstructed design basis rather than treating a contractor’s clause summary as proof of compliance.

Advertisement

Make faults, restrictions, repairs and retests traceable

Give every fault a unique reference linked to the affected asset and zone. Record the failed expected outcome, observed result, discovery time, operational consequence, relevant photographs or readings, and the person notified. Sertus advises recording faults or damage in the system logbook and arranging repairs promptly.[3]

For a temporary restriction or interim measure, record its authoriser, start date, review point and affected zones. Colt says the Responsible Person should assess whether additional interim measures are needed when compromised performance cannot be restored immediately.[4]

In England, the additional high-rise residential duties apply to buildings containing at least two domestic premises that meet the Regulations’ height or storey test: at least 18 metres, measured as specified, or at least seven storeys. Government guidance requires monthly checks of specified equipment, including smoke-control systems and linked detection systems. If a fault revealed by these checks cannot be rectified within 24 hours of discovery, notify the local fire and rescue service electronically as soon as reasonably practicable, and notify it electronically once rectified. Retain the check records. These checks supplement servicing and maintenance.[8] This specific notification rule must not be presented as applying to every building across the UK; establish the jurisdiction and building scope in the contract.

Do not close a repair on a job-completion note alone. Require a linked post-repair test of the affected cause-and-effect path against defined acceptance criteria. The contract should name the retest owner, deadline, witness and signatory, and specify the acceptance record.

Advertisement

Specify the maintenance handover before appointment

Require a handover pack containing:

  • the building address, representative contacts, system type and maintenance-provider details;
  • the system schematic, asset inventory and zone-by-zone cause-and-effect matrix; and
  • inspection and test results, fault history, certificates and links between each defect, repair and retest.[5]

Each result should identify the date, engineer, zone, asset identifier, initiation method, expected state, observed state and outcome. Update the records after faults, replacements, modifications, design changes, zone reconfiguration or building alterations affecting smoke control.[5]

Request the proposed certificate, fault-report and retest templates before appointment. Sertus says the maintenance engineer’s name and telephone number should be displayed at the main control panel and the associated documentation kept current.[3] Require exclusions, inaccessible assets, unresolved criteria and outstanding defects to be stated clearly.

Advertisement

Compare Group SCS and Colt

Compare the same three contract dimensions: maintenance scope, support for third-party systems and emergency assistance.

Group SCS

  • Published maintenance scope: annual servicing, a six-monthly functional check, operational-sequence checks, smoke-shaft volumetric-flow measurements, testing of directly interfaced detectors, software diagnostics or updates, reports and chargeable call-outs at the contract rate.[2]
  • Support for third-party systems: unknown from the cited Group SCS page.[2]
  • Emergency assistance: hours, response commitments and escalation arrangements are also unknown from the cited page.[2]

Colt

  • Published maintenance scope: annual specialist maintenance assessing cause-and-effect, airflows, opening and closing times, charge rates, motor resistance and watertightness.[4]
  • Support for third-party systems: Colt says it services systems manufactured or installed by other companies.[4]
  • Emergency assistance: contract customers can access a 24-hour, 365-day emergency call-out service.[4]

Colt reports an average response within 18 hours and a four-hour emergency-response aim, but these are vendor-reported figures rather than independently validated outcomes.[4] If response performance will affect the award, put the service level, measurement method and remedy for missed performance into the contract.

Advertisement

What to confirm with each provider

Colt states UK-wide coverage; Group SCS is based in Cardiff, but its cited page gives no nationwide service area.[2][4]

Obtain written answers on:

  • total price, planned-maintenance charges, remedial labour, parts and emergency call-outs;
  • minimum contract period, renewal, cancellation notice and cancellation fees;
  • property eligibility, geographical coverage and subcontracting;
  • coverage of every installed make, model, detector interface and control platform;
  • emergency hours, response commitments, exclusions and escalation;
  • the applicable standards, manufacturer instructions and test frequencies; and
  • responsibility, deadline and sign-off requirements for post-repair cause-and-effect retesting.

Certification terminology also differs: Group SCS uses IFC SDI19, while Colt uses IFCC SDI 19.[2][4] Ask each provider to confirm the scheme’s applicable title and scope.

Issue one controlled request for quotation

Give both providers the same fire strategy, system design, asset list, zone matrix, interface boundaries, known faults and required handover deliverables.[4][5] Require each bidder to:

  • state assumptions, exclusions, inaccessible assets, third-party-system limits and subcontracting;
  • identify the standards, manufacturer instructions, test frequencies and evidence of engineer and organisational competence; and
  • accept or amend the proposed responsibilities for fault recording, repairs, cause-and-effect retesting and sign-off.

Score the ability to verify intended zone-by-zone operation and provide fault-to-retest evidence before comparing coverage, emergency support and commercial terms.

References

  1. Private residential blocks – local authority and landlord responsibilities | London Fire Brigade (london-fire.gov.uk)
  2. Testing and Maintenance | Aftercare | Group SCS (groupscs.co.uk)
  3. Smoke ventilation system maintenance: What you need to know | Sertus (sertus.uk)
  4. Smoke Control Maintenance FAQs | Colt GB (colt-international.co.uk)
  5. How to Build a Smoke Control Asset Register | Vent Trade (vent-trade.co.uk)
  6. BSI — BS 9999 current release: BS 9999:2017 (bsigroup.com)
  7. BSI — BS 7346-8:2013, current standard catalogue (bsigroup.com)
  8. Home Office — Fire Safety (England) Regulations 2022: responsibilities for high-rise residential buildings (gov.uk)