Compare Fenner Conveyors and Splice Tech on belt compatibility, work-pack scope and joint acceptance before comparing quoted shutdown duration. Use the same requirements for both bidders: website detail is not a capability ranking.

Top-down view of a sprawling industrial mining site featuring heavy machinery and detailed terrain.
Advertisement

Compare scope, QA evidence and disclosed limits

Fenner Conveyors

  • Scope: Fenner lists steel-cord, rubber-ply and solid-woven underground belts, with hot vulcanising, cold vulcanising and mechanical fastening options. It says trained and certified technicians select the splice type and work to the belt OEM’s procedure. [1]
  • QA evidence: Fenner describes recorded process parameters, Digital X-ray images and a customer report, with checks against the OEM’s procedure. [1] Confirm whether this package is included in the proposal.
  • Disclosed limits: The cited Belt Splicing page does not state a maximum belt width, belt rating or project size, or provide a method-selection matrix. [1] Request confirmation for the nominated belt and duty.
Advertisement

Splice Tech

  • Scope: Splice Tech describes emergency and scheduled splicing, installation, repair and refurbishment, with manpower, equipment and project management available. [3]
  • QA evidence: Its mechanical services include inspection and reporting; the splicing description does not list splice QA records. [3] Ask for a splice-specific records schedule rather than assuming one from the general service description.
  • Disclosed limits: Splice Tech lists vulcaniser sets for belts up to 2,400 mm wide and NSW branches at Berkeley, Marulan and Mudgee; confirm coverage for sites outside that area. [3]

These are provider descriptions, not independent comparative performance evidence. [1][3] A gap in public disclosure is not proof of missing capability.

Advertisement

Define the belt and duty before agreeing the method

Give each bidder the same belt-and-duty description, covering:

  • Belt identification, construction, rating, dimensions, condition and repair history.
  • Relevant tension, pulley details, temperature, conveyed material and chemical exposure.

Ask for the proposed method, applicable OEM procedure and written compatibility confirmation. For high-flex or high-fatigue rubber-plied duty, ask whether Fenner’s High Integrity Splice merits evaluation: Fenner identifies this application. [1] Request project-specific compatibility limits before agreeing to it.

Request a controlled work pack for the splice

Put the agreed requirements into a revision-controlled work pack both bidders can price. Treat this as a buyer-requested deliverable, not an advertised package.

Advertisement
  • Job identity: record the splice identifier, belt-and-duty description, agreed method and applicable OEM procedure revision.
  • Execution scope: define task boundaries, supplied labour and equipment, access and isolation responsibilities, exclusions, contingencies and assumptions behind the shutdown estimate.
  • Crew evidence: request proposed crew credentials and relevant belt/method experience. Ask Fenner for project-specific evidence supporting its stated technician training and certification. [1]
  • Technical attachments: attach the materials schedule, traceability requirements, acceptance schedule, hold/witness points, reporting deliverables and named sign-off responsibilities.
  • Commercial attachments: include agreed warranty terms, variation-approval authority and allocation of shutdown overruns.

Keep adjacent work explicit. Splice Tech offers wider mechanical maintenance and shutdown services alongside splicing. [3] Mark additional tasks as included or excluded rather than assuming they belong in the splice price.

Advertisement

Check materials and consumable traceability

Fenner offers steel-cord and fabric-ply splice kits tailored to the application and operating environment. Contents include sized skim/filler gum and cover rubber or PVC paste, application-ready solutions and solvents, a contents list, chemical material safety data sheets, release fabric and protective plastic. [2]

Fenner describes laboratory-tested rubber components, hazardous-substance markings, individual wrapping, protective timber crates and kit identification labels. [2] The cited Splice Kits page does not establish consumable batch-to-joint traceability, expiry controls or job-specific material certificates. [2]

Ask either contractor for a material schedule linking each consumable to:

  • Its manufacturer and product designation.
  • Its batch or lot and applicable shelf-life information.
  • The splice identifier, with available testing and storage records attached.

Have the contractor confirm suitability for the nominated belt and duty, and name who approves substitutions. Do not assume Fenner kits are included in either contractor’s price.

Agree what makes the joint pass

Separate the procedure to follow, the records of what happened and the criteria for accepting the joint. Fenner’s stated OEM-procedure checks, recorded parameters, Digital X-ray images and customer report provide evidence; ask what results would trigger acceptance, reinspection or rejection. [1]

Ask engineering and each contractor to agree a written acceptance schedule before work begins, including measurable pass/fail limits, X-ray interpretation criteria, report templates and sign-off forms:

  • Procedure: identify the applicable OEM document and revision.
  • Assessment: specify project-specific inspections or tests and measurable acceptance criteria, with engineering confirming suitability for the belt and method.
  • Evidence: identify records demonstrating each criterion, plus hold and witness points.
  • Exceptions: agree how non-conformances, corrective work and reinspection will be handled.
  • Authority: name authorised signatories and distinguish joint acceptance from permission to return the conveyor to service.

Require the handover record to link the splice’s agreed requirements to materials used, inspection results, authorised deviations and the acceptance decision.

What to confirm with each provider

The cited provider pages do not publish splice pass/fail limits, prices, warranty terms, acceptance-risk transfer or shutdown commercial terms. [1][2][3] Ask each contractor to confirm in writing:

  • Warranty boundaries: workmanship, supplied materials, pre-existing belt condition and subsequent operating damage; warranty period, claim process, investigation responsibility, rectification, reinspection, consequential-loss treatment and required customer records.
  • Quote and shutdown terms: inclusions, mobilisation charges, payment terms, assumptions, variation approval, cancellation or postponement provisions, delay allocation and contingency costs.
  • Acceptance and remedies: when acceptance transfers risk, and how warranty remedies remain distinct from joint acceptance criteria.

Choose on confirmed fit, then shutdown duration

Have both bidders mark each requirement in the same work-pack revision included, excluded or requiring clarification before award.

  • Fenner Conveyors: consider its published belt and method coverage and described QA package against the job; confirm their inclusion in writing. [1]
  • Splice Tech: consider its combined field labour, equipment and project management scope; confirm belt compatibility, QA deliverables and coverage of the Australian site. [3]

Record the decision against confirmed compatibility, remaining qualifications, material evidence, acceptance criteria and agreed remedies—not shutdown duration alone.

References

  1. Belt Splicing (fenner.com.au)
  2. Splice Kits (fenner.com.au)
  3. Services | Splice Tech (splicetech.com.au)